Logo
Lac Gold Limited
Rouyn Project — JORC 2012
JORC 2012

Mineral Resources

Mineral Resource Estimates (JORC 2012)

Mineral Resource Estimate, September 2023, Rouyn Gold Project and Kasagiminnis (Pickle Lake)
September 2023 Indicated Inferred Total
Astoria1 Tonnage (Mt)Grade (g/t)Gold Ounces (koz) Tonnage (Mt)Grade (g/t)Gold Ounces (koz) Tonnage (Mt)Grade (g/t)Gold Ounces (koz)
Ultramafic 2.93.16293 3.73.28386 6.53.23679
Argillite 0.53.8860 0.44.5651 0.84.17112
Sub-Total 3.43.27353,657 4.03.40437 7.43.34791
Augmitto-Cinderella2 TonnesGrade (g/t)Ounces TonnesGrade (g/t)Ounces TonnesGrade (g/t)Ounces
Ultramafic 1.93.54214 1.02.9494 2.93.33308
Argillite 0.12.6210 0.43.7343 0.53.4553
Sub-Total 2.03.48224 1.43.15137 3.43.35361
LAC Gamble3 TonnesGrade (g/t)Ounces TonnesGrade (g/t)Ounces TonnesGrade (g/t)Ounces
Ultramafic 3.73.27391 1.02.7384 4.73.16475
Argillite 0.12.318 0.33.2231 0.42.9839
Sub-Total 3.83.24398 1.32.85116 5.13.14514
Rouyn Gold Project Total 9.23.30976 6.63.24690 15.83.281,666
Kasagiminnis (Pickle Lake) --- 0.84.3110 0.84.3110

Notes:

Due to the effects of rounding, totals may not represent the sum of all components.

Refer to Appendix 1 (JORC Table 1) of the accompanying company announcement for further details on the Mineral Resource Estimates.

Rouyn Gold Project

Compiled from 1,460 drill holes for a total of 190,622m.

Resource estimated by ERM using US$2,200 gold price and various crown pillar assumptions.

Cut-off grades – Ultramafic: 1.72g/t, Argillite: 2.07g/t

Rouyn Gold Project Recovery Assumptions

  1. Astoria assumes 96% recovery for Ultramafic and 80% recovery for Argillite
  2. Augmitto-Cinderella assumes 96% recovery for Ultramafic and 90% recovery for Argillite
  3. LAC Gamble assumes 96% recovery for Ultramafic and 80% recovery for Argillite
Lac Gold — vue 1
Lac Gold — vue 2
Lac Gold — vue 3