Cen Can Expo Presentation
Released
Released
Announcement PDF
Pickle Lake Gold Project
Developing a New Mining Hub
September 2023
ASX:ADV
Disclaimer
This presentation has been prepared by Ardiden Limited (ASX:ADV) (Company)
Summary of information: This presentation contains general and background information about the Company’s activities current as at the date of the presentation (unless stated otherwise) and should not be considered to be comprehensive or to comprise all the information that
an investor should consider when making an investment decision. The information is provided in summary form, has not been independently verified, and should not be considered to be comprehensive or complete. The Company is not responsible for providing updated
information and assumes no responsibility to do so.
Not financial product advice: This presentation is not financial product, investment advice (nor tax, accounting or legal advice) or a recommendation to acquire the Company securities and has been prepared without taking into account the objectives, financial situation or needs of
individuals. The information in this presentation does not contain information which would be required in a disclosure document or prospectus prepared in accordance with the requirements of the Corporations Act. Before making an investment decision prospective investors
should consider the appropriateness of the information having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances. The Company is not licensed to provide financial product
advice in respect of its securities or any other financial products. Cooling off rights do not apply to the acquisition of the Company securities. The Company assumes that the recipient is capable of making its own independent assessment, without reliance on this document, of the
information and any potential investment and will conduct its own investigation.
Market and Industry data: Certain market and industry data used in connection with or referenced in this presentation may have been obtained from public filings, research, surveys or studies made or conducted by third parties, including as published in industry-specific or general
publications. Neither the Company nor any of its advisers or their respective representatives have independently verified any such market or industry data.
Disclaimer: The Company and its related bodies corporate and each of their respective directors, agents, officers, employees and advisers expressly disclaim, to the maximum extent permitted by law, all liabilities (however caused, including negligence) in respect of, make no
representations regarding, and take no responsibility for, any part of this presentation and make no representation or warranty as to the currency, accuracy, reliability or completeness of any information, statements, opinions, conclusions or representations contained in this
presentation. In particular, this presentation does not constitute, and shall not be relied upon as, a promise, representation, warranty or guarantee as to the past, present or the future performance of the Company.
Future performance: This presentation contains certain forward-looking statements and opinion, which may be identified by the use of words such as “expect”, “anticipate”, “likely”, “intend”, “should”, “could”, “may”, “predict”, “plan”, “propose”, “will”, “believe”, “forecast”,
“estimate”, “target” “outlook”, “continue”, “guidance” and other similar expressions. The forward-looking statements, opinion and estimates provided in this presentation are based on assumptions and contingencies which are subject to change without notice, as are statements
about market and industry trends, which are based on interpretations of current market conditions. Forward-looking statements, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future
performance and involve known and unknown risks, uncertainties and other factors, many of which are outside the control of the Company. There can be no assurance that actual outcomes will not differ materially from these forward-looking statements. A number of important
factors could cause actual results or performance to differ materially from the forward-looking statements, including the risk factors set out in this presentation. Investors should consider the forward-looking statements contained in this presentation in light of those risks and
disclosures. The forward-looking statements are based on information available to the Company as at the date of this presentation. Except as required by law or regulation (including the ASX Listing Rules), the Company undertakes no obligation to supplement, revise or update
forward-looking statements or to publish prospective financial information in the future, regardless of whether new information, future events or results or other factors affect the information contained in this presentation.
Past performance (including past share price performance) referred to in this presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of the Company’s views on its future financial performance or condition. Past performance is
not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking statements or other forecast.
Previously Reported Information: This presentation refers to the following information previously announced to the ASX, which is available to view on the Company’s website at www.ardiden.com.au:
•
•
•
•
•
7 August 2023 – Drilling Intersections Higher Grade and Extends Trend
11 May 2023 – Drilling Confirms Broad Mineralisation
21 February 2023 – Drilling Set to Commence at Pickle Lake Gold Project
7 November 2022 – Sale of Lithium JV Complete
26 October 2022 – Exploration Results
•
•
•
•
26 September 2022: Ardiden Confirms Further Broad Zones of Gold Mineralisation
17 August 2022: Assays Report Exciting Wide and High -Grade Gold Intercepts
14 June 2022: Initial Results Confirm Upside Gold Potential at Pickle Lake
18 February 2020 High Grade Gold Intercepts over 25km Strike at Pickle Lake
The Company confirms that it is not aware of any other new information or data that materially affects the information included in the original market announcements referred to above, and that all material assumptions and technical parameters underpinning the estimates in
those announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.
Not an offer: This presentation is not, and should not be considered as, an offer or an invitation to acquire securities in the Company or any other financial products and neither this presentation nor any of its contents will form the basis of any contract or commitment.
This presentation is not a prospectus. Offers of securities in the Company will only be made in places in which, or to persons to whom it would be lawful to make such offers. This presentation must not be disclosed to any other party and does not carry any right of publication.
Neither this presentation nor any of its contents may be reproduced or used for any other purpose without the prior written consent of the Company.
Photographs: Photographs of customers in this presentation are not photographs of the Company’s actual customers and have been used for illustration purposes only.
Monetary values: Unless otherwise stated, all dollar values are in Australian dollars (A$). The information in this presentation remains subject to change without notice.
2
Pickle
Project
ClickLake
to edit
Master
100% owned
Prospective land package in the highly endowed
Uchi sub-province of NW Ontario
• Significant footprint, amassing > 1088km2, in the ‘Uchi’
region, a prolific mineral belt with 32Moz* Au produced to
date
• Tier 1 mining jurisdiction surrounded by large producing and
historic gold mines in one of the world's best gold provinces
• Defined growth strategy for our “belt scale” targets
• Fully permitted for 2023-2024 exploration
*Source S&P Global Market Intelligence, June 2023
3
3
Why invest? – Prospective Asset in a
Tier 1 jurisdiction
100% owned
Large-scale
landholding
Highly
experienced
Funded into 2024
Pickle Lake
Gold Project in NW
Ontario, Canada
In an emerging,
underexplored,
geologically
significant region
Board and
management
Sale of Lithium JV
secures funding
to accelerate
exploration
4
Environmental, Social & Governance
Measured and Sustainable approach to ESG
Health, safety
and wellbeing
People, diversity
and inclusion
Community
and culture
Environmental
sustainability
Zero Lost Time Injuries
with >15,000m of
helicopter supported
diamond drilling
40% Female Directors
----------33% Female Senior
Management
----------First Nations Community
Liaison Manager
MOU with Cat Lake,
Mishkeegogamang and Slate
Falls Nations
----------Traditional Ecological
Knowledge Study
Commenced
First Nation owned hydro
power project running
through Pickle Lake Gold
Project
----------Ongoing baseline water
sampling in waterways
5
History of Pickle Lake Regional
Exploration & Mining
• Several high-grade gold mines operated in the area by different companies during the 1980’s and 1990’s
• Many different companies explored various parts of the regional area independently with small programs
• No company had ever consolidated the area to compile the data in a systematic approach to unlock future potential
• Ardiden consolidated a 1,088 km2 land package between 2019-2022, completely surrounding Barrick’s historical Golden Patricia Gold
Mine
• Ardiden appointed Canadian technical experts to its team applying fresh eyes on this underexplored region
6
Developing New Mining Hub in Pickle Lake
Focus near term exploration on developing resources to support a
mining hub in the west portion of the Pickle Lake Gold Project
Application of small programs to start to prove up thesis and allow time
for infrastructure establishment
Easily scalable drill program to accelerate pace of work once concepts
proven and infrastructure sufficiently advanced
Undertake small scale field programs on remainder of land package to
evaluation additional opportunities
Maintain a strong relationship with First Nations in the area and local
community to ensure all areas are fully permitted for exploration
7
Pickle Lake Gold Project
• Large Greenfields Project with 23 prospects in Pickle Lake
• Ongoing targeted exploration to unlock the value of this underdeveloped region
• Three FN Communities with long standing relationships, MOU in place with Cat Lake, Mishkeegogamang, and Slate Falls
• Fully Permitted Pickle Lake Gold Project, for early exploration activities
The potential quantity and grades stated for the Exploration Target is conceptual in nature and there has been insufficient exploration to define Mineral Resources across the exploration
target area. It is uncertain if further exploration of these targets will produce results that permit additional Mineral Resources to be estimated.
8
Current Plans
• Ongoing data review across the Western Hub
• Hyperspectral logging and data analysis from 2023
drilling
• Petrographic analysis of 2023 and historical drill
core
• Targeting small drill program at Dobie and Tonsil
• Low-level High-Resolution Gradient Heli-Mag
Geophysical Survey on Meen-Dorothy-Cooper
(circled red)
• Priority 1 (Dobie, Tonsil, and Dorothy)
• Priority 2 (West/Cooper, New Patricia, and
Kasagiminnis)
9
Dobie Prospect
• 2022 drill program was conducted to test historical assays within the secondary trend,
medium grade-width and broad low-grade zones identified
• Mineralisation style at Dobie is with a complex deformation zone parallel to the Bear
Head Shear Zone (BHSZ), unlike the sheared diorite hosted mineralisation at Dorothy
• 5km strike length of untested ground along the parallel structures to the boundary of the
Golden Patricia mine (Barrick)
Historical Drilling Results:
• DOB-09-010 19.00m @ 1.57 g/t, including 3.50m @ 4.7 g/t, 1.00m @ 10.6 g/t, and
4.00m @ 5.3 g/t
• DOB-09-011 25.10m @ 1.51 g/t, including 2.00m @ 3.1 g/t, 8.50m @ 2.4 g/t, and
0.80m @ 9.1 g/t
• DOB-09-012 6.60m @ 2.6 g/t, including 0.50m @ 8.4 g/t
• DOB-09-013 4.00m @ 2.8 g/t, including 1.00m @ 5.2 g/t
• DOB-09-014 12.40m @ 2.4 g/t, including 1.00m @ 8.5 g/t, and 2.00m @ 2.3 g/t
• DOB-16-017 7.90m @ 2.1 g/t
• MD-87-025 3.70m @ 4.1 g/t, including 1.10m @ 5.5 g/t, and 0.60m @ 9.6 g/t
• MD-88-049 3.20m @ 8.8 g/t, including 0.60m @ 40.1 g/t
• MD-88-40B 2.90m @ 6.0 g/t, including 1.55m @ 8.2 g/t, and 1.15m @ 4.80 g/t
10
Tonsil Prospect
• Maiden drill program was conducted at Tonsil Prospect in early 2022, 19 holes for 2,680m
• Targeting mineralisation within the primary trend, narrow high-grade zones identified within metasediments similar to Esker
Prospect
• Several historical reports highlighting 30 drill holes with visual gold within drill core, no assays available
• Located 2.1km NW of Dobie
Historical Drilling Results:
• DOR-07-05 0.44m @ 153.30g/t Au from 111.40m
• MD-90-113 0.40m @ 17.48g/t Au from 54.12m
• MD-90-119 0.32m @ 26.40 g/t Au from 60.34m
• MD-90-121 0.40m @ 7.88g/t Au from 60.43m
• MD-90-136 0.40m @ 9.94 g/t Au from 41.31m
• MD-90-145 0.51m @ 5.83 g/t Au from 158.12m
11
Dorothy Prospect
• 2022 drill program was conducted to test historical resource/assays, 2023 confirms 900m strike length (red circle) with
>10km of untested structural targets
• Targeting mineralisation within the tertiary trend, medium grade-width and broad low-grade zones identified
• Significantly deformed, complex region hosting multiple untested structures that trend parallel to the Bear Head Shear Historical Drilling Results:
• DOR-90-043 0.50m @ 472.8 g/t Au from 184.10m
Zone (BHSZ)
• DOR-88-034 1.50m @ 13.7 g/t Au from 43.32m
• High accumulation of cross cutting dilation shear zones, believed to be the conduit of mineralised fluids from the BHSZ
• Several overprinting sequences identified at Dorothy from the BHSZ
• 900m strike length (red circle) with >10km of untested structural targets
•
•
•
•
•
DOR-88-026 4.75m @ 3.2 g/t Au from 34.50m
DOR-88-025 20.65m @ 3.6 g/t Au from 96.85m
DOR-88-028 8.63m @ 5.5 g/t Au from 55.82m
DOR-88-026 7.75m @ 3.1 g/t Au from 19.00m
DOR-88-032 7.12m @ 3.6 g/t Au from 113.06m
12
West / Cooper Prospects
• 2023 drilling of four holes highlighted a prospective shear hosted system unlike what is
present across the Western Hub
• Targeting mineralisation from historical data on a splay off the Dorothy trend
• Significantly sheared region with mafic volcanics that displays 1km of strike from historical
assays, secondary zone hosting gold mineralisation within a metasediment remains untested
to the south of the main trend
• Shallow mineralisation in DR-23-36/37 remains open at depth and along strike
Historical Drilling Results:
• MDW-90-021 0.43m @ 8.91 g/t
• MDW-90-026 1.10m @ 12.00 g/t , 1.17m @ 3.30 g/t, including 0.58m @
7.50 g/t, and 2.62m @ 2.60 g/t, including 0.90m @ 5.10 g/t
• DOR-88-32 7.12m @ 3.6 g/t, 2.04m @ 1.55 g/t, and 0.83m @ 3.26 g/t
• DOR-88-34 1.50m @ 13.70 g/t, 1.48m @ 1.03 g/t, 0.67m @ 1.03 g/t, and
1.2m @ 2.23 g/t
13
New Patricia Prospects
• Maiden drill program was conducted at Esker prospect in early 2022, 18 holes for 2,206m
• Targeting mineralisation within the primary trend, narrow high grade and medium width-grade
zones identified
• Heli Mag, VLF-EM and Radiometric Survey conducted in 2020 across New Patricia, Golden Patricia,
and Dobie Prospects
• LiDAR conducted in 2021 across the Western Hub
• Large untested fold nose, dilation zone, ultramafic intrusive and high compression area
Historical Drilling Results:
• 5.35m @ 3.1g/t Au from 80.65m in drillhole ME88006
(including 24.0g/t Au over 0.3m)
• 12.03m @ 3.2g/t Au from 29.9m in drillhole ME88008
(including 13.5g/t Au over 0.9m)
• 1.92m @ 3.7/t Au from 66.96m in drillhole KW8608
• 1.5m @ 4.8g/t Au from 44.65m in drillhole KW8713
• 0.3m @ 9.6g/t Au from 108.28m in drillhole M8605
14
Kasagiminnis Prospect
• Maiden Resource produced by Optiro-Snowden in 2019 from drilling conducted in 1986,
1987, 1988, 2011, and 2018 on the property
• Extent of current resource is 110,000k oz @ 4.3 g/t Au over ~600m strike and up to a
depth of 280m with the 3.0g/t Au cut-off*
KAS-87-006 4.24m @ 21.00 g/t
KAS-18-001 4.70m @ 4.1 g/t including 1m @ 27.6 g/t
• Large untested areas 682250-682750 from 100-280m depth (circled yellow)
KAS-18-004 21.00m @ 3.97 g/t, including 12.50m @ 5.9 g/t, and 2.8m @ 9.17 g/t
• Access via winter road for exploration programs
KAS-18-006 3.40m @ 5.52 g/t, and 0.5m @ 21.2 g/t
KAS-18-008 15.40m @ 3.21 g/t
KAS-18-010 26.20m @ 3.19 g/t
KAS-20-002 6.00m @ 4.23 g/t
KAS-20-003 6.50m @ 4.28 g/t
KAS-21-006 10.0m @ 1.38 g/t from 52.0m including 1m @ 5.25g/t and 1m @ 4.55 g/t
* Refer to ADV ASX Release– 10 September 2019, Maiden High-Grade Resource at Pickle Lake
15
Board & Management Team
Proven track record to deliver world class projects
BOARD
Michelle Roth
Interim Nonexecutive Chair
MBA Finance, BA Hons
Political Science
A veteran
entrepreneur and
experienced New
York-based investor
relations specialist.
Jeremy
Robinson
Non-executive
Director
BA Commerce
A veteran
entrepreneur with
varied experience in
the resources sector.
Matthew
Freedman
Non-executive
Director
BA Business Admin
An experienced executive
within the mining and
related services sector.
Pauline Gately
Non-executive
Director
BA Hons, Econ, Grad Dip
Acc, GAICD
An international investment
banking veteran with
experience spanning
exploration through to
commercial production.
MANAGEMENT
Greg Romain
Tara Robson
Chemical Eng. Tech.
BA (Accounting) FGIA,
CPA (US), GAICD
CFO & Co-Sec
Exploration Manager
An experienced executive
in leading mineral
exploration and
development companies.
An experienced finance and
governance executive
skilled in equity and project
financing, JVs & risk
management.
Geologist with over 15
years of mining and
exploration experience in
Australia, Africa and
Canada.
CEO & MD
Haydn Daxter
BA Geoscience (Mineral
Deposits) MAIG
Our Key Advisors
Proven track record to deliver world class projects
Eric Kallio
Strategic Advisory - Exploration
Mr Kallio has over 35 years of experience
working on exploration, underground and open
pit mine planning, scoping and feasibility
studies in Canada and abroad. He has been
instrumental in the discovery or advancement
of several successful projects including the
Dome Mine Open Pit (Timmins ON), the Detour
Gold Open Pit (Cochrane ON), the Island Gold
project (near Wawa ON) and discoveries by
Lake Shore Gold in the Timmins Gold Camp.
Since May 2023
John Frostiak
Strategic Advisor - Metallurgy
Mr Frostiak is a semi-retired seasoned
mining
individual
who
has
worked
domestically and internationally in diverse
operations, operating management and
project development roles over 40 years. He
has been in leadership positions on teams who
have delivered three new producing mines for
Barrick Gold through all development phases
from Scoping studies, Pre-Feasibility studies,
Feasibility studies to construction and startup.
Since August 2023
Tony Marinaro
Indigenous and Community
Liaison Manager
Mr Marinaro has over 25 years experience
working in First Nations governance to deliver
mutually beneficial projects having long term
sustainable outcomes. He is a certified Economic
Development Professional and holds an
Associate in Arts and an Applied Science Degree
in Human Services Technology. Mr. Marinaro is a
Saulteux/Ojibwe and presently sits on the Board
of Directors for the Anishnawbe Business
Professionals Association.
Since February 2021
17
Corporate Overview
Share Price (6 months)
Key Metrics
ASX Code
ADV
Share Price
0.6c
Shares on Issue
2,688M
Unlisted Options
- Broker options
- Employee options
91.6M
54.6M
37.0M
Market Capitalisation
A$16.1M
Cash Position @ 30 June (Inc Escrow Amount)
A$14.2M
Shares in GT1
A$6.3M
Top 20 Shareholders
25.0%
Directors and Management
5.4%
Information above is at close of market 11 September 2023 unless otherwise noted.
18
Further Information
Competent Person’s Statement
The information in this report that relates to Exploration Results and Exploration Targets at the Pickle Lake Prospects is based on, and fairly represents, information and supporting documentation prepared by Mr
Haydn Daxter, a Member of the Australian Institute of Geoscientists, Mrs Christine Standing, a Member of the Australian Institute of Geoscientists and a Member of the Australasian Institute of Mining and
Metallurgy, that are named competent person or persons; Mr Daxter is a full-time employee of Ardiden Limited, Mrs Standing is employed by Snowden – Optiro Pty Ltd and is a consultant to Ardiden. Mr Daxter and
Mrs Standing have sufficient experience which is relevant to the style of mineralisation and type of deposit and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Daxter and Mrs Standing consents to the inclusion in this report of the matters based on this
information in the form and context in which it appears.
Clarification Statement Exploration Target - The potential quantity and grade is conceptual in nature, that there has been insufficient exploration to estimate a Mineral Resource and that it is uncertain if further
exploration will result in the estimation of a Mineral Resource.
The information in this report that relates to JORC Mineral Resources at the Kasagiminnis Deposit is based on, and fairly represents, information and supporting documentation prepared by Mrs Christine Standing, a
Member of the Australian Institute of Geoscientists and a Member of the Australasian Institute of Mining and Metallurgy. Mrs Standing is employed by Snowden – Optiro Pty Ltd and is a consultant to Ardiden. Mrs
Standing has sufficient experience which is relevant to the style of mineralisation and type of deposit and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mrs Standing consents to the inclusion in this report of the matters based on this information in the form and
context in which it appears.
The Company confirms that it is not aware of any other new information or data that materially affects the information included in the original market announcements referred to above, and that all material
assumptions and technical parameters have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Non-JORC historical estimates (1987-1993) by original owners of the Dorothy and Dobie Deposits, were summarised in 2009 in an NI43-101 Technical Report on Gold Properties within the Pickle Lake area (Harron,
2009). The historical resource estimates are not reported in accordance with the JORC Code and a competent person has not done sufficient work to classify the historical estimates as mineral resources in accordance
with the JORC Code. It is uncertain that following evaluation and further exploration work that the historical estimates will be able to be reported as mineral resources in accordance with the JORC Code. * - Non-JORC
historical estimates (Seim 1993) by MNDM OFR5869 of the Koval Deposit were summarised in the 1993 non-NI 43-101 report. The historical resource estimates are not reported in accordance with the JORC Code
and a competent person has not done sufficient work to classify the historical estimates as mineral resources in accordance with the JORC Code. It is uncertain that following evaluation and further exploration work
that the historical estimates will be able to be reported as mineral resources in accordance with the JORC Code.
Reference: Harron, 2009 NI43-101 Technical Report on “Three Gold Exploration Properties Pickle Lake Area, Ontario, Canada, for Manicouagan Minerals Inc”, G.A. Harron, P.Eng., G.A. Harron & Associates Inc,
October 13, 2009.: www.murchisonminerals.com/site/assets/files/5443/pickel-lake-project_tehcnical_report.pdf
19
For Further Information
Greg Romain, CEO/MD
Contact Details
PH: +61 8 6184 5938
info@ardiden.com.au
www.ardiden.com.au
20
Share your feedback
Discover