Lac Gold Acquisition
Released
Released
Announcement PDF
Legal/92837331_6
ASX Code: ADV
ABN: 82 110 884 252
www.ardiden.com.au
ARDIDEN LTD
Level 1, 45 Ventnor Ave
West Perth WA 6005
Tel: +61 (8) 6184 5938
10 October 2025
Ardiden and Lac Gold to Create a Leading Canadian
Gold Exploration and Development Company
Ardiden Ltd (‘Ardiden’, ‘ADV’ or ‘the Company’) (ASX: ADV) is pleased to announce a transformational merger
with Lac Gold Limited (‘Lac Gold’ or ‘LAC’), creating a dual-asset Canadian gold explorer and developer with
scale, strategic balance and multiple growth pathways.
Highlights
• Transformational merger: Ardiden has entered into a binding Share Sale Agreement (‘Agreement’) with
Lac Gold and certain key shareholders of Lac Gold, owner of the advanced-stage Rouyn Gold Project
(‘Rouyn Project’ or ‘Project’) within the tier 1 Abitibi gold belt, Québec, Canada. This merger of equals
consolidates a high-grade asset with the potential to unlock future synergies at Ardiden’s Pickle Lake
Gold Project (‘Pickle Lake'), while providing a clear pathway to development.
• Premier location: Located along the Cadillac–Larder Lake Break (‘Cadillac Break’), the Rouyn Project lies
within the same geological setting as several major nearby gold mines and deposits—including LaRonde-
Bousquet, Lapa, and Westwood – all hosted within the Piché Group (Figure 3). The Project is situated
just four kilometres south of Rouyn-Noranda, a key mining centre in the region.
• Large, high-grade resource: The Rouyn Project is at an advanced stage, hosting a substantial JORC
(2012) Mineral Resource of 15.8 Mt @ 3.28 g/t Au for 1.66 Moz (refer to pages 4, 9 and Appendix 1 for
further details). The Project benefits from significant infrastructure advantages, including established
surface facilities and strategic land holdings across key areas of the project. Notably, the current
Resource has been defined from drilling at relatively shallow depths of only 400–700 metres. In
contrast, neighbouring operations along the Cadillac Break are mining at depths approaching 3,000
metres, underscoring the strong potential for resource expansion at the Rouyn Project through deeper
drilling.
• Balanced portfolio: The Rouyn Project offers advanced-stage growth potential, while ADV’s Pickle Lake
in Ontario, anchored by three known deposits and multiple high-priority drill targets, provides district-
scale discovery upside (Figure 2). Both projects are located within two of Canada’s most prolific and
stable gold regions.
• Leadership strength: The proposed merged board and executive team bring a proven track record in
exploration success, project management and development, as well as value-accretive transactions
consistently delivering strong returns to shareholders.
• Transaction consideration: Lac Gold shareholders will receive 101,388,889 ADV shares in consideration
for their shares in Lac Gold, subject to shareholder approval.
• Well-funded for growth: Ardiden has received firm commitments to raise A$10 million at $0.20/share,
a 5.3% premium to ADV’s last trading price and 18.6% premium to the 30-day VWAP, subject to
shareholder approval. When aggregated with the existing cash balance of A$11.4 million (30 June 2025),
the Company is well positioned to rapidly advance work programs across both the Rouyn and Pickle Lake
projects.
• Board approval: The Ardiden Board and Lac Gold Board unanimously recommend the transaction and
each member of the Ardiden Board intends to vote all shares in favour of the transaction. Ardiden’s
two largest shareholders have also indicated their intention to vote in favour of the transaction.
2 | P a g e
Legal/92837331_6
Figure 1 – Surface infrastructure at the Rouyn Gold Project in Quebec
Commenting on the merger, Ardiden’s Chair, Michelle Roth stated:
“This merger with Lac Gold marks a pivotal next step in our growth strategy. Rouyn adds a high-quality
resource in Québec’s world-class Cadillac Break, complementing the scale and potential of Pickle Lake in
Ontario. Together, we are creating a well-funded Canadian gold explorer and developer with a strong
leadership team, a balanced portfolio, and a clear path to unlocking long-term value for our shareholders.”
Both Chairs emphasised the strong strategic alignment between Ardiden and Lac Gold and the opportunity to
create a well-capitalised Canadian gold company with enhanced scale, balance and growth potential.
Lac Gold’s Chair, Ian Hume stated:
“The merger with Ardiden marks an exciting new chapter for Lac Gold and a strong endorsement of the Rouyn
Gold Project and our team. By combining our complementary assets and expertise, we are establishing a
company with the strength and focus to advance our projects across two of Canada’s most prospective gold
belts. We share a common vision for responsible growth and long-term value creation, and I’m confident this
combination will deliver meaningful benefits for our shareholders and stakeholders.”
Figure 2 – Projects location map
3 | P a g e
Legal/92837331_6
Strategic Rationale
The merger of ADV and LAC brings together complementary projects and operational strengths, establishing a
Canadian-focused gold explorer with scale, quality assets, and a clear growth pathway.
• Scale and balance – The Rouyn project provides an advanced-stage, high-grade resource with near-term
growth opportunities, while Pickle Lake offers a district-scale exploration pipeline. This balance
enhances optionality and risk-adjusted value creation.
• Jurisdictional strength – With projects in Ontario and Québec, consistently ranked among the world’s
top 10 mining jurisdictions, the Company benefits from extensive infrastructure, permitting support and
regulatory stability, underpinning long-term project viability.
• Operational efficiencies – Shared facilities and integrated technical teams are expected to reduce costs,
accelerate exploration timelines, and improve capital efficiency.
• Regional processing advantage – Proximity to underutilised processing infrastructure positions the
merged company to leverage existing regional capacity. The region hosts multiple established
processing facilities with spare milling capacity. Agnico Eagle’s nearby Malarctic Operations have
articulated a “Fill-the-Mill” strategy, positioning themselves as a toll-milling partner of choice for
regional developers, while its Wasamac Project (which shares a tenement boundary with Rouyn) is
under consideration for development. Similarly, IAMGOLD’s Westwood Operations have publicly noted
available capacity within the existing Doyon mill and continue to seek additional regional ore sources.
This concentration of underutilised processing infrastructure provides the merged company with a
potential fast-track development pathway and multiple low-capital processing options.
Figure 3 – Regional Location Map – Rouyn Gold Project, Abitibi Gold Belt, SE Quebec
.
4 | P a g e
Legal/92837331_6
Overview of Lac Gold
Lac Gold Limited (LAC) is an Australian unlisted, public gold exploration and development company. Founded
and headquartered in Western Australia, Lac Gold is backed by a consortium of high-net-worth individuals,
family offices, and resource industry professionals.
The company’s flagship asset is the 100%-owned Rouyn Gold Project, located just four kilometres south of
Rouyn-Noranda along Quebec’s prolific Cadillac Break, a tier-one gold jurisdiction. The Cadillac – Larder Lake
Break is one of Canada’s most important gold-producing structures, home to numerous multi-million-ounce
deposits and ongoing major-company investment. It was acquired from Yorbeau Resources Inc (TSX: YRB) in
December 2024.
Rouyn Gold Project
Lac Gold holds a 100% interest in the Rouyn Gold Project through its subsidiary company Lac Gold (Rouyn) Inc.
registered in British Columbia, Canada. The Project comprises 73 contiguous mining claims and 1 mining
concession. Lac Gold also has substantial fixed building infrastructure and a 29-year lease over the surface rights
across key parts of the project area.
Location of the project
The Rouyn Gold Project is located immediately south of the city of Rouyn-Noranda in Québec, Canada, a major
mining centre with established infrastructure, skilled labour, and a strong mining culture (Figure 3).
Québec is ranked as one of the world’s top mining jurisdictions, offering stable regulations, supportive
communities, and access to clean, low-cost hydropower. The broader region is known for its rich mining history,
having produced ~200 million ounces of gold over the past 100 years.
The total project covers approximately 12 kilometres of strike and hosts high-grade gold mineralization in close
proximity to operating gold plants (e.g. Agnico-Eagle’s LaRonde, Malarctic, Goldex and Macassa Complexes,
IAMGOLD’s Westwood operations, and Eldorado Gold’s Lamaque Complex).
The Mineral Resource estimate (‘MRE’), for the Rouyn Gold Project, has been reported in accordance with the
JORC Code (JORC, 2012) and is presented in Table 1. The MRE is reported above a cut-off of 1.72 g/t Au for
ultramafic material (96% recovery) and 2.07 g/t Au for Argillite material (80% recovery), inside Mineable Stope
Optimisations (‘MSOs’), which include internal dilution, generated using a gold price of US$2,200/oz. The MRE
has been appropriately depleted for previous mining voids.
Table 1: Rouyn Gold Project, Mineral Resource Estimate
Classification Material type
Au cut-off
(g/t)
Tonnage
(Mt)
Gold
(g/t)
Gold Ounces
(koz)
Indicated Ultramafic 1.72 8.5 3.29 898
Argillite 2.07 0.7 3.43 78
Total Indicated 9.2 3.30 976
Inferred Ultramafic 1.72 5.6 3.13 565
Argillite 2.07 1.0 3.86 126
Total Inferred 6.6 3.24 690
TOTAL 15.8 3.28 1,666
Note: Due to effects of rounding, totals may not represent the sum of all components.
Refer to Material Information Summary and Appendix 1 (JORC Table 1) below for further details on the MRE.
5 | P a g e
Legal/92837331_6
Transaction Details
Overview
• ADV will acquire 100% of the fully paid ordinary shares in LAC. In consideration for the acquisition, ADV
will issue 101,388,889 ADV shares to Lac shareholders. Each LAC shareholder will receive approximately
0.891 fully paid shares of Ardiden for every 1 Lac Gold share held.
• Completion is subject to customary conditions including Ardiden shareholder approval.
Structure
• Share-for-share transaction with no cash component.
• Lac Gold existing debt of C$20M at 5% interest, will remain in place, secured against the project.
• Capital structure designed to preserve balance sheet flexibility while maximising investment into value-
creating work programs and project advancement.
Ardiden has entered into a Share Sale Agreement (‘Agreement’) with Lac Gold and each of certain key
shareholders of Lac Gold – Andrew Stocks, Matthew Keegan and Victoria Road Holdings Pty Ltd, a company
associated with Matthew Keegan (collectively the ‘Major Sellers’). Under the terms of the Agreements, and the
agreements to be entered into with the minority Lac Gold shareholders, Ardiden will acquire 100% of LAC’s
shares through the issue of 101,388,889 ADV shares. Each LAC shareholder will receive approximately 0.891
fully paid shares of Ardiden for every 1 LAC share held at closing of the transaction (‘Exchange Ratio’) and holders
of LAC performance rights will receive performance rights in Ardiden.
Upon completion of the transaction (excluding the Placement set out below), existing Ardiden and Lac Gold
shareholders will own approximately 38.1% and 61.9% of the merged entity, respectively. Andrew Stocks will
hold a relevant interest in 8,909,393 ADV shares, representing approximately 4.16% of the merged entity
(including the placement) and Matthew Keegan will hold a relevant interest in 35,637,568 ADV shares,
representing approximately 16.66% of the merged entity (including the placement).
Completion of the transaction remains subject to and conditional on:
• ADV obtaining all necessary shareholder approvals to give effect to the transaction, including approval
for the issue of consideration shares to LAC shareholders, the issue of shares under the Placement (see
below), and the issue of performance rights to Andrew Stocks, Matthew Keegan and Ian Hume and
existing directors of the Company;
• ASX not withdrawing its previous confirmation that Listing Rules 11.1.2 and 11.1.3 will not apply to the
transaction;
• Each of the minority Lac Gold shareholders entering into an agreement to sell their shares in Lac Gold
to ADV on terms satisfactory to ADV;
• ADV raising at least A$10 million (before costs) under the placement;
• ADV and key executives of LAC having entered into executive service agreements; and
• Other customary conditions for a transaction of this nature.
Appendix 2 contains a summary of the terms of the Agreements.
Shareholders are encouraged to read the accompanying investor presentation released in parallel with this
announcement, which provides additional technical detail and context.
6 | P a g e
Legal/92837331_6
Indicative Transaction Timetable
(All dates are indicative and subject to change)
Milestone Date / Timing Description
Transaction
Announcement
Friday,
10 October 2025
ADV announces binding Share Sale Agreements with
Lac Gold Limited and major Lac Gold shareholders and
receipt of binding commitments for A$10 million
Placement.
Notice of Meeting lodged
and dispatched
No later than Friday,
24 October 2025
Notice of Annual General Meeting (AGM) and
Explanatory Memorandum dispatched to ADV
shareholders.
Record Date for voting
entitlements
Monday,
24 November 2025
Shareholder eligibility cut-off for AGM voting purposes.
ADV Annual General
Meeting / Shareholder
Approval
Wednesday,
26 November 2025
Shareholder vote on resolutions approving the Lac Gold
acquisition and Placement.
Completion of Share Sale
Agreement
Early December 2025
Completion of transaction following satisfaction of all
conditions precedent. Issue and quotation of
consideration shares to Lac Gold shareholders.
Settlement of Placement
Shares
Early December 2025
Settlement of A$10 million Placement (subject to
shareholder approval).
Allotment and
Commencement of Trading
for Placement Shares
Mid December 2025
Issue and quotation of new ADV shares under the
Placement.
Integration and Work
Program Planning
December 2025
Integration of ADV and LAC teams and commencement
of coordinated exploration planning across Rouyn and
Pickle Lake.
7 | P a g e
Legal/92837331_6
Pro-Forma Capital Structure
Description Shares Options
Performance
Rights
Current issued capital 62,517,506 4,268,021 Nil
Shares to be issued to Lac Gold shareholders 101,388,889 Nil Nil
Shares to be issued under the Placement 50,000,000 Nil Nil
Performance Rights to be issued to directors
and incoming directors1 Nil Nil 20,000,000
Total on completion of the transaction 213,906,395 4,268,021 20,000,000
Note 1: Comprises 6,000,000 performance rights to be issued to Andrew Stocks, 6,000,000 performance rights to be
issued to Matthew Keegan, 2,000,000 performance rights to be issued to Ian Hume, 2,000,000 performance rights to be
issued to Michelle Roth, 2,000,000 performance rights to be issued to Jeremy Robinson and 2,000,000 performance rights
to be issued to Tara Robson. Full details of the performance rights will be detailed in the notice of meeting to be
dispatched in the coming weeks.
Post-Merger Operations
Rouyn will serve as the operational hub for both projects, providing core processing, logging, storage, and office
facilities in a well-established mining centre. Field crews will rotate between both sites to maximise the use of
expertise and equipment while reducing logistical costs.
In addition, the nearby cities of Rouyn-Noranda, Kirkland Lake and Val-d’Or host a wide range of exploration and
mining support services, including drilling contractors and labour providers. Perth will continue to operate as
the Company’s corporate headquarters.
Figure 4 – Rouyn infrastructure (left to right) core racks & headframe, core logging station, automatic core saw
8 | P a g e
Legal/92837331_6
Leadership & Board
The proposed board will comprise three nominees from each company:
• Ian Hume, Non-Executive Chair – Founding partner of a US$2.5B global resources fund; former director
of Andean Resources until its US$3.5B acquisition by Goldcorp.
• Andrew Stocks, Managing Director – Mining engineer with 35+ years’ leadership in corporate functions,
mine development and operations.
• Matthew Keegan, Executive Director – Geologist with 30 years’ corporate, investment and operational
geology experience.
• Michelle Roth, Non-Executive Director – Current ADV Chair; extensive background in resource
governance and capital markets.
• Jeremy Robinson, Non-Executive Director – Mining executive with experience in resources investment
and corporate strategy.
• Tara Robson, Non-Executive Director – North American qualified CPA experienced in project financing,
joint ventures, acquisition/disposition of mineral assets and other contractual arrangements.
Management:
• John Fitzgerald, Chief Financial Officer – expertise in capital raising, debt financing and cross-border
financial and tax management.
• Paul Teniere – General Manager, Canadian Operations — extensive experience in exploration, resource
reporting and Canadian project delivery.
The merged company will be led by an experienced team with a proven track record in exploration success, mine
development/commissioning, and corporate transactions that have generated billions in shareholder value.
Funding
The Company has received firm commitments to raise approximately A$10.0 million through the issuance of
50.0 million shares at $0.20 per New Share (“New Shares”) via a conditional share placement (“Placement”).
The Placement issue price of $0.20 per New Share represents a 5.3% premium to ADV’s last trading price and
18.6% premium to the 30-day VWAP. The issue of New Shares under the Placement is subject to shareholder
approval. Blue Ocean Equities Pty Limited has been appointed as Sole Lead Manager to the Placement.
Together with the existing cash balance of A$11.4 million (30 June 2025), the merged company will be strongly
funded to accelerate exploration and project advancement across both Rouyn and Pickle Lake.
• Director Support – Churchill Strategic Investments, an entity of which Jeremy Robinson is a beneficial
shareholder, and incoming directors Ian Hume, Andrew Stocks and Matthew Keegan have agreed to
participate in the capital raising for approximately A$1.73 million collectively. The participation by
Churchill Strategic Investments is subject to shareholder approval.
• Lac Gold Debt (Rouyn) – C$20 million facility remains in place on highly favourable terms – low 5%
interest rate, staged repayments, secured against Rouyn, providing non-dilutive leverage to growth.
• Capital Efficiency – The combined structure ensures the Company is:
o Funded to execute near-term programs;
o Positioned to deliver high-impact work programs and technical milestones; and
o Able to limit dilution while advancing aggressively.
9 | P a g e
Legal/92837331_6
Promissory Note Summary
The acquisition of the Rouyn Gold Project by LAC included a vendor financing arrangement with Yorbeau
Resources Inc., structured as a C$20 million Promissory Note dated 10 December 2024. The note carries an
annual interest rate of 5%, payable in arrears, and is secured against the Rouyn Gold Project. Principal
repayments are scheduled in three equal instalments of approximately C$6.67 million, due 24, 36, and 48
months from the issue date—falling in December 2026, 2027, and 2028, respectively.
Importantly, the Promissory Note contains no change-of-control or cross-default provisions and imposes no
restrictions on corporate or financing activities unrelated to the Rouyn asset, offering substantial operational
and strategic flexibility for Lac Gold and the merged entity. The note is also prepayable, in whole or in part, at
any time without penalty—allowing for early debt reduction as project cash flows improve.
Use of Funds (Year 1 Programs)
The current indicative and proposed expenditure programs for both projects are set out below. These are
statements of current intentions as of the date of this announcement and the allocation of funds may change
depending on various intervening events and new circumstances, including the outcome of exploration and
development activities, regulatory developments and market and general economic conditions.
Rouyn – A$6.1 million: A 15,000-metre diamond drilling program is set to commence, structured in three 5,000-
metre phases. The program will target resource expansion and infill drilling, with a focus on west-plunging high-
grade structures. Additional planned activities include an updated Mineral Resource Estimate, continued
community engagement, and the initiation of economic and permitting studies based on the existing resource
base.
Pickle Lake – A$3.0 million: Initial work will concentrate on the South Limb prospect within the Eastern Hub,
targeting areas immediately south of the historic Dona Lake Gold Mine that were not tested during the 2021
field program. Concurrently, the new management team will undertake a comprehensive review of all existing
geological and geophysical data to identify new targets and prioritise future exploration efforts across the
broader Pickle Lake district.
Next Steps
• Shareholder meeting to approve issue of consideration shares to Lac Gold shareholders and the issue
shares under the placement;
• Integration of teams and operational planning; and
• Targeted exploration programs at both Rouyn and Pickle Lake.
The merged company will immediately pursue value-accretive work programs at both projects.
Material Information Summary – Rouyn Gold Project Mineral Resource Estimate
Geology and Geological Interpretation
The Rouyn Gold Project lies within the Abitibi Greenstone Belt (‘AGB’) in the southern portion of the Archaean
Superior Province, located on the Lake Larder Cadillac Fault Zone. It is classified as an orogenic gold deposit.
The Rouyn Gold Project spans 6 km of gold bearing strike hosted within the Piché Group and collectively
comprises four deposits, defined as:
• Augmitto;
• Cinderella;
• Lac Gamble; and
• Astoria.
10 | P a g e
Legal/92837331_6
All deposits share similar geological characteristics and are related to the Larder Lake–Cadillac Fault Zone
(‘LLCFZ’) and other second and third-order structures. The mineralised domains are restricted to the influence
zone of the LLCFZ in the ultramafic rocks of the Piché Structural Complex and peripheral to the ultramafic rocks
in the Timiskaming sediments.
Figure 5 – Geology of the Rouyn Gold Project along the Cadilac Lake Larder Break.
Drilling techniques
Historical (Pre-2005)
For drillholes completed prior to 2005, no documentation is available regarding drilling, logging or sampling,
methods other than diamond drilling (DD) methods were used; however, specific details such as core sizes are
not available. There is evidence that some drillholes were completed using BQ diameter core. Wireline drilling
methods appear to have been adopted around 1980.
Post 2005
Collar locations were set out by handheld global positioning system (‘GPS’) and holes aligned by a geologist or
field technician. Downhole surveys were completed using a Reflex EZ-shot instrument. Surveys started 12–15 m
below the collar, and readings were taken every 30 m downhole. For wedge-cuts, readings were taken at every
9 m downhole for the first 100 m and variable thereafter depending on the deviation. Drill core was placed into
core boxes and labelled wooden blocks were inserted every 3 m. Core was then transported to the core shed
for processing. Upon completion of a hole, in most cases, a plug was inserted and an identification tag attached,
and the drill site then restored to its natural state.
All drillholes completed after 2005 were drilled using NQ diameter. Triple-tube coring (‘NQ3’) was routinely
employed to maximize core recovery. In some holes, core orientation was conducted using a Reflex ACT III
orientation tool, with orientation lines marked at the end of each 3-metre drill run.
A summary of the drilling which was used to inform the MRE is provided in Table 2.
11 | P a g e
Legal/92837331_6
Table 2 Details of the drillholes used for the MRE
Deposit
No. of historical
(pre-2005) holes
Metreage of
historical holes
No. of recent
(post-2005) holes
Metreage of
recent holes
Augmitto-Cinderella 728 64,199 178 75,104
Astoria 725 124,917 58 32,711
Lac Gamble 7 1,506 180 73,382
Sampling and sub-sampling techniques
Historical (Pre-2005)
There is no information on the logging, sampling and subsampling methods used before 2005. It is assumed that
the methods used would have followed accepted industry practice of the time.
Post 2005
Half-core was used for analysis, with the core cut using an electric saw. Lithology, mineralization, alteration,
and structural features, including any visible gold, were recorded during logging. Sampling intervals were
selected based on the logged geology. Core sample lengths ranged from 0.5 to 2 metres, with most samples
being 1 metre long and defined along geological contacts. Core recovery was considered excellent, except for
short intervals within fault zones.
Sample Analysis Methods
Several laboratories have been used for sample preparation and analysis since 2005, these include Lab-Expert
(Rouyn-Noranda, Québec), ALS (Val-d’Or, Québec), AGAT Laboratories, and Techni-Lab.
A summary of laboratory sample preparation and analytical procedures by period is provided below:
• Historical (Pre 2005)
Information regarding assaying techniques pre-2005 is not available. It is assumed that analytical
techniques would have followed accepted industry practice at the time.
• 2005-2011
All analyses were performed using 50 g fire assay (‘FA’) with atomic absorption spectroscopy (AAS)
finish. Samples returning assays greater than 3 g/t Au were re-assayed using fire assay with gravimetric
finish. Laboratory sample preparation procedures for this period are not documented.
• 2013–2014
Sample preparation involved crushing the entire sample to 70% passing 10 mesh, followed by riffle
splitting to obtain a ~1.5 kg sub-sample. This sub-sample was pulverized to 85% passing 200 mesh. A
250 g aliquot was used for FA-AAS analysis. Samples returning assays greater than 8 g/t Au were re-
assayed using fire assay with gravimetric finish. One-kilogram screen fire assays (‘SFA’) were completed
in cases where visible gold was observed.
• 2016–2017
Samples were crushed to 90% passing 2 mm, followed by riffle splitting to obtain a 1 kg sub-sample.
This sub-sample was pulverized to 95% passing 106 µm. All analyses were performed using 50 g fire
assay with AAS finish. Assays exceeding 3 g/t Au were re-assayed using fire assay with gravimetric finish.
• 2019–2022
ALS Minerals and AGAT Laboratories (both in Val-d’Or, Québec) employed consistent methodologies.
Samples were dried, then crushed to 90% passing 2 mm. A 1,000 g sub-sample was riffle split and
pulverized to 95% passing 106 µm prior to analysis. A 50 g pulp was used to detect gold by fire assay
12 | P a g e
Legal/92837331_6
with AAS finish. If the sample graded more than 3 g/t Au at AGAT, or 5 g/t at ALS, then a second pulp
was analysed by fire assay with gravimetric finish. At both laboratories if that second sample exceeded
10g/t Au then a SFA was completed using identical methodologies.
Estimation Methodology and Classification
The Rouyn Gold Project consists of three contiguous block models—Augmitto-Cinderella, Lac Gamble, and
Astoria—aligned along a west-east trending mineralized zone. Their eastings extend as follows:
• Augmitto-Cinderella: 334,300 mE to 337,300 mE
• Lac Gamble: 337,300 mE to 338,600 mE
• Astoria: 338,600 mE to 341,000 mE
Three-dimensional mineralization wireframes were constructed using Seequent™ Leapfrog software and
subsequently imported into Surpac for use in the Mineral Resource Estimate (‘MRE’). Each wireframe was
treated as a hard boundary during grade interpolation.
High-grade assays were capped prior to compositing and estimation where appropriate, based on analysis of
log-probability plots, histograms, and disintegration analysis. Out of 26,385 assays, 55 were capped with limits
ranging between 25 g/t Au and 100 g/t Au.
Compositing lengths differed by domain: 1.5 m composites were used for Augmitto-Cinderella, while Lac Gamble
and Astoria utilized 1.0 m composites.
Variography was conducted separately for each mineralized domain, except for the footwall domain, which had
insufficient samples and thus used variography derived from the footwall contact domain. Variogram
orientations were aligned with the strike and dip of their respective mineralized zones.
Block sizes reflect the scale of mineralization and likely mining methods. Augmitto-Cinderella employed blocks
of 6 m × 6 m × 6 m with sub-blocking at 1.5 m × 1.5 m × 1.5 m. Lac Gamble and Astoria used blocks sized 4 m ×
4 m × 4 m with sub-blocking at 1 m × 1 m × 1 m.
Grade interpolation was performed using Inverse Distance Squared (‘ID2’) with a three-pass search strategy.
The first and second passes used search radii matching the variogram ranges, while the third pass extended to
twice the variogram range. Blocks not estimated in earlier passes were estimated in subsequent passes. Search
ellipses were oriented according to variogram directions, aligned with the strike and dip of the mineralized
domains.
Classification
The MRE was classified as Indicated and Inferred as detailed below.
For Indicated:
• Blocks showing good geological and grade continuity inside mineralisation wireframes
• Blocks interpolated by a minimum of three drillholes
• Blocks in areas where drill spacing is no more than 50 metres for Augmitto-Cinderella and Lac Gamble and
no more than 35 metres for Astoria.
For Inferred:
• Blocks showing reasonable geological and grade continuity inside mineralised wirefr
Share your feedback
Discover