Investor Briefing
Released
Released
Announcement PDF
28 January 2026
ASX: ADV
Investor Briefing
Unlocking Canada’s Next World-Class Gold
Discovery
Matthew Keegan – Executive Director
Augmitto surface facilities, Rouyn Gold Project, Québec
Disclaimer
This presentation is dated 28 January 2026 and has been prepared by Ardiden Ltd (ACN 110 884 252) (ADV, Ardiden or the Company). Please read this disclaimer carefully before reading or making any
other use of this presentation or any information contained in this presentation.
Summary information only: The information in this presentation is summary information only and is current as at the date of this presentation (unless otherwise indicated), and the information in this
presentation remains subject to change without notice. The information in this presentation is general in nature and does not purport to be accurate nor complete, nor does it contain all of the information
that an investor may require in evaluating a possible investment in Ardiden, nor does it contain all the information which would be required in a disclosure document or prospectus prepared in accordance
with the requirements of the Corporations Act. This presentation has been prepared by Ardiden with due care but no representation or warranty, express or implied, is provided in relation to the accuracy,
reliability, fairness or completeness of the information, opinions or conclusions in this presentation by Ardiden or any other party involved in its preparation, except as required by law. Reliance should not
be placed on information or opinions contained in this presentation and, Ardiden does not have any obligation to finalise, correct or update the contents of this presentation, except as required by law. This
presentation should be read in conjunction with Ardiden's other periodic and continuous disclosure announcements lodged with the ASX, which are available at www.asx.com.au.
Forward looking statements: This presentation contains “forward-looking statements” and “forward-looking information”, such as statements and forecasts which include (without limitation) financial
forecasts, exploration targets, industry and trend projections, statements about the feasibility of the Pickle Lake Gold Project and the Rouyn Gold Project (collectively the Projects) and its financial
outcomes, future strategies, results and outlook of Ardiden and the opportunities available to Ardiden. Often, but not always, forward-looking statements and information can be identified by the use of
words such as “plans”, “expects”, “is expected”, “is expecting”, “budget”, ‘outlook”, “scheduled”, "target", “estimates”, “forecasts”, “intends”, “anticipates”, or “believes”, or variations (including negative
variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might”, or “will” be taken, occur or be achieved. Such information is based on assumptions
and judgments of Ardiden regarding future events and results. Readers are cautioned that forward-looking statements and information involve known and unknown risks, uncertainties and other factors
which may cause the actual results, targets, performance or achievements of Ardiden to be materially different from any future results, targets, performance or achievements expressed or implied by the
forward-looking statements and information.
Forward-looking statements and information are not guarantees of future performance and involve known and unknown risks, uncertainties, sensitivities, contingencies, assumptions and other important
factors, many of which are beyond the control of Ardiden and its directors and management. Past performance is not a guide to future performance. Key risk factors are detailed (non-exhaustively) in this
presentation and in previous ASX announcements. These and other factors (such as risk factors that are currently unknown) could cause actual results, targets, performance or achievements anticipated to
differ materially from those expressed in forward-looking statements and information. Forward-looking statements and information are based on the reasonable assumptions, estimates, analysis and
opinions of Ardiden made in light of its perception of trends, current conditions and expected developments, as well as other factors that Ardiden believes to be relevant and reasonable in the
circumstances at the date such statements are made, but which may prove to be incorrect. Although Ardiden believes that the assumptions and expectations reflected in such forward-looking statements
and information (including as described throughout this presentation or in the ASX announcement which it accompanies) are reasonable, readers are cautioned that this is not exhaustive of all factors
which may impact on the forward-looking statements and information. Ardiden does not undertake to update any forward-looking statements or information, except in accordance with applicable
securities laws.
Not financial product advice: This presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial product or investment advice, financial, legal, tax,
accounting or other advice, or a recommendation to acquire any securities of Ardiden. It has been prepared without taking into account the objectives, financial or tax situation or particular needs of any
individual. Ardiden is not licensed to provide financial product advice in respect of an investment in securities or otherwise. Each investor must make its own independent assessment of Ardiden before
acquiring any securities in the Company.
Not an offer: This presentation is not a prospectus, product disclosure statement or other offering document under Australian law or any other law and will not be lodged with the Australian Securities and
Investments Commission. This presentation is for information purposes only and is not an invitation, offer or recommendation with respect to the subscription, purchase or sale of any security in Ardiden,
or any other financial products or securities, in any place or jurisdiction.
2
This presentation has been prepared by Ardiden Limited (ASX:ADV) (Company)
Disclaimer
JORC Code: This presentation contains estimates of the Mineral Resources estimated for the Projects. This information in this presentation that relates to those Mineral Resources for the
Pickle Lake Gold Project has been extracted from Ardiden's accompanying ASX announcement entitled “Maiden High-Grade Gold Resource at Pickle Lake" dated 10 September 2019, a
copy of which is available at www.asx.com.au. Ardiden confirms that it is not aware of any new information or data that materially affects the information included in that announcement
and, in relation to the estimates of Mineral Resources, confirms that all material assumptions and technical parameters underpinning the estimates in that announcement continue to
apply and have not materially changed. Ardiden confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the
announcement.
This information in this presentation that relates to those Mineral Resources for the Rouyn Gold Project has been extracted from Ardiden’s accompanying ASX announcement entitled
“Merger Announcement” dated 10 October 2025, a copy of which is available at www.asx.com.au. Ardiden confirms that it is not aware of any new information or assumptions and
technical parameters underpinning the estimates in that announcement continue to apply and have not materially changed. Ardiden confirms that the form and context in which the
Competent Persons’ findings are presented have not been materially modified from the announcement.
Non-IFRS financial measures: This presentation may contain certain financial measures (such as Net Present Value (NPV) and Internal Rate of Return (IRR)) that are not recognised under
International Financial Reporting Standards (IFRS). Although the Company believes these measures provide useful information about the Company's financial forecasts, they should not be
considered in isolation or as a substitute for measures of performance or cash flow prepared in accordance with IFRS. As these measures are not based on IFRS, they do not have
standardised definitions and the way the Company calculates these measures may not be comparable to similarly titled measures used by other companies. Consequently, undue reliance
should not be placed on these measures.
Past Performance: Any information regarding past performance included in this presentation is given for illustrative purposes only and should not be relied upon as (and is not) an
indication of Ardiden’s views, or that of any other party involved in its preparation, on Ardiden’s future performance or condition or prospects.
No liability: The information contained in this presentation has been prepared in good faith by Ardiden. However, no guarantee, representation or warranty expressed or implied is or
will be made by any person (such as Ardiden and its affiliates, directors, officers, employees, associates, advisers and agents) as to the accuracy, reliability, correctness, completeness or
adequacy of any statements, estimates, options, conclusions or other information contained in this presentation, except as required by law.
To the maximum extent permitted by law, Ardiden and its affiliates, directors, officers, employees, associates, advisers and agents each expressly disclaims any and all liability, including,
without limitation, any liability arising out of fault or negligence, for any loss arising from the use of or reliance on information contained in this presentation including representations or
warranties or in relation to the accuracy or completeness of the information, statements, opinions, forecasts, reports or other matters, express or implied, contained in, arising out of or
derived from, or for omissions from, this presentation including, without limitation, any financial information, production targets, financial forecasts, estimates or projections and any
other information derived therefrom. No responsibility or liability is assumed by Ardiden or any of its affiliates, directors, officers, employees, associates, advisers or agents for updating
information in this presentation or to inform any recipient of any new or more accurate information or any errors or omissions of which Ardiden or any of its affiliates, directors, officers,
employees, associates, advisers or agents may become aware, except as required by law.
Monetary values: Unless otherwise stated, all dollar values are in Australian dollars (A$). The information in this presentation remains subject to change without notice.
Market and Industry data: Certain market and industry data used in connection with or referenced in this presentation may have been obtained from public filings, research, surveys or
studies made or conducted by third parties, including as published in industry-specific or general publications. Neither the Company nor any of its advisers or their respective
representatives have independently verified any such market or industry data.
3
Corporate Snapshot
As at 28 January 2026
CAPITALISATION SUMMARY
Share Price $A (ASX:ADV – 28 Jan 2026) $0.41
Shares Issued 214.9M
Fully Diluted 238.2M
Undiluted Market Capitalisation $88.1M
Cash @ 31 Dec 2026 $18.2M
FLAGSHIP PROJECT
Rouyn Gold Project – Québec
73 mining claims, 1 mining concession – 100% owned
BOARD & MANAGEMENT
Ian Hume – Chairman ⏐ Michele Roth – NED
Jeremy Robson – NED ⏐
Andrew Stocks: Managing Director
Tara Robson: NED & CoSec
John Fitzgerald: Chief Financial Officer
Matthew Keegan: Executive Director
Paul Teniere: General Manager, Canada
SHARE PRICE PERFORMANCE & 3 MONTH COVERAGE
Board & Management Ownership - 27%
5
Ardiden Today
A Strong, Well-Capitalised Canadian Gold Company
1.8 Moz High-Grade Resource Base* across two world-
class jurisdictions
• Flagship Asset – Rouyn: 1.66 Moz @ 3.28 g/t*
• District-Scale Growth: Pickle Lake (675 km², 20+ priority
targets)
• Well-Capitalized: ~$18.2M cash + flexible vendor
financing
• Tier-1 Jurisdictions: Québec & Ontario
• Clear Path to Value Creation: Defined 2026 execution
roadmap
* Refer resource table at Appendix 2 (slide 22)
Rouyn Gold Project, Québec. Augmitto site head-frame building & core racks
Project team at Rouyn, Québec (Andrew Stocks, Paul Teniere, Matthew Keegan)
6
TheInvestment Thesis
A High-Grade, Capital-Light Gold Opportunity
• Exceptional drill density materially reduces
geological risk
• Clear toll-milling pathway significantly lowers
capital intensity
• Compelling resource growth potential at depth and
along strike
• Tier-1 infrastructure in a proven, low-risk
jurisdiction
• Trading at a meaningful discount to peers on an
EV/oz basis
The strategy: Advance Rouyn through disciplined, value-driven execution
7
Drilling at Astoria Project Area
8
Portfolio Overview
Flagship Development Asset Plus Long-Term Discovery Upside
Rouyn Gold Project
Mineral Resource Estimate, Apr 2025
15.8Mt@3.28g/t, 1,666,000oz gold *
Pickle Lake Gold Project
Mineral Resource Estimate, Sep 2019
790,000t @ 4.3 g/t, 110,000oz gold *
Rouyn Gold Project – Québec
• High-grade, well-drilled development
asset
• 1.66 Moz @ 3.28 g/t (JORC 2012) *
• 2,428 drill holes (436,678 m)
• Mineral Resource remains open
• Exceptional infrastructure: power,
roads, mills, labour
Pickle Lake Gold Project – Ontario
• Discovery engine with district-scale
upside
• 110,000oz @ 4.3 g/t (JORC 2012) *
• 675 km² district scale landholding
• 20+ high-priority targets
* Refer resource table at Appendix 2 (slide 22)
9
Rouyn Gold Project
High Grade, Scale and Clear Growth Potential
Rouyn combines strike length, grade and location – positioned for resource growth in Québec’s premier gold belt
• 1.66 Moz @ 3.28 g/t Au (JORC 2012) *
• Current drilling to approximately 400-700m
depth – nearby mines operating at 1,250-
3,000m depth (LaRonde, Westwood, Bousquet)
• Strong potential for down plunge extensions
• 2026 drilling to test resource in-fill and
expansion targets
Independent validation (ERM, April 2025)
“In ERM’s opinion, given the geological setting and
depth of mineralisation at nearby mines (LaRonde)
on the Cadillac Fault, there is considerable likelihood
that mineralisation will be present below 700 m
depth…”
Stage 1 – Astoria
Stage 2 – Astoria, Gamble
Stage 3 – Augmitto, Gamble
* Refer resource table at Appendix 2 (slide 22)
10
Stage 1Drilling Program Underway
15,000m program commenced at Astoria*
• Stage 1 diamond drilling has commenced at Astoria,
a key area within the eastern corridor of the Rouyn
Gold Project
• 15,000 metres of drilling planned, targeting high-
priority zones with strong upside
• Program focused on expanding known
mineralisation and unlocking new potential
• Infill and confirmatory drilling to strengthen
geological confidence and refine continuity
• Testing depth extensions beneath historical mining
areas, where upside remains largely untested
• Results from Astoria will feed directly into a future
updated geological model and Mineral Resource
Estimate
A
A’
* Refer Ardiden Limited ASX Announcement, 27 January 2026
Astoria Cross Section looking west showing
Hanging wall, Main and Footwall zone ore
zone targets
Astoria planned drill-hole
collar locations
11
Further Expansion Pathway
Large-Scale Depth Potential in a Proven Gold System
• Significant organic growth upside from grade
and tonnage expansion at depth, with minimal
drilling below 400–600 m
• System remains open along strike and at
depth
• Multiple laterally continuous lodes within a
fertile, well-understood Archean shear system
• Capital-efficient wedge drilling enables deep
target testing from single trace holes,
maximizing data and minimizing cost and
footprint
• Strong regional validation from Westwood and
LaRonde mines operating to ~3,000 m depth
12
Rouyn Gold Project
A rare, large-scale Canadian Archean gold system with staged
development optionality
• High-grade down-plunge targets
ready to accelerate resource
growth – multiple stacked zones
• Laterally continuous lodes in a
large-scale Archean shear system
– well understood structure with
significant upside potential
• 2026 Drill Program: Infill and
expansion – targeting both
resource definition and discovery
of new extensions
13
Exceptional Location and Infrastructure
A Rare Combination of World-Class Geology and Urban-Level Services
13
Abitibi - A prolific, established gold belt
• 200Moz mined over the past century
• Neighbouring operators: Agnico Eagle,
Eldorado, IAMGOLD
Infrastructure Advantage
• 4 km from Rouyn-Noranda (pop. ~42,000)
• Sealed road access, grid hydro power
• Skilled local workforce and mining services
• Multiple operating gold plants nearby
• Year-round access and logistics
14
Québec
One of the World’s Very Best Gold Jurisdictions
• Québec is a Tier-1 mining jurisdiction with
established frameworks and predictable
permitting
• Low-cost, renewable hydro power, sealed roads,
close to mining cities
• Long mining history and skilled local workforce
• Strong community and First Nations
engagement pathways
• Producing region: Agnico Eagle, Eldorado,
IAMGOLD
• Val-d’Or and Kirkland Lake nearby
Rouyn-Noranda, Québec
15
Pickle Lake Gold Project
Driving the Discovery Pipeline
District-scale discovery engine in a proven high-grade gold camp
• 675 km² district scale tenement package
• Underexplored despite prolific gold endowment
• Kasagiminnis Deposit – Inferred Resource 110
koz @ 4.3 g/t Au* (JORC)
• 20+ brownfield and greenfield targets
• Field work program planned for South Limb
• Substantial assessment credits secure tenure
through 2029
* Refer resource table at Appendix 2 (slide 22)
Ardiden’s Pickle Lake project, Ontario
Rouyn
• 15,000 m initial drilling program at Astoria
• Testing resource extension targets across the
broader project area
• Updating geological model and Mineral Resource
Estimate
• Preliminary economic analysis and
commencement of environmental baseline
monitoring
• Ongoing news-flow from drilling and parallel work
programs
Pickle Lake
• Strategic review and target prioritisation underway
• Reconnaissance-level, low-impact field work
planned
2026Value Catalysts
Focused Execution to Drive Growth and De-Risking
16
Rouyn Gold Project, Core Storage Farm at Augmitto Site
Investment Summary
Positioned for Growth, De-Risking and Re-Rating
17
High-grade, large-scale flagship asset
Low-risk, capital-light strategy
Significant resource growth upside
Projects located in two, Tier-1 jurisdictions
Strong balance sheet
Undervalued relative to peers
Night Drilling at Astoria – Rouyn Gold Project
Appendices
18
1. Geological Background
2. Mineral Resource Estimates
3. Competent Person Statements
Logging drill core at Ardiden’s Western Hub, Pickle Lake
19
1. Geological Background
Value generation over the next three years
Value generation potential from testing resource extensions, economic studies based on the existing
Mineral Resource and potentially securing mining permits to reactivate underground mining
STUDIES
• Community and First Nations
engagement
• Economic studies based on the
existing Mineral Resource
• Investigate and planning for the
reactivation of underground
mining
• Environmental permits
anticipated to take 2-3 years due
to data collection requirements
EXPLORE OPPORTUNITIES
• Evaluation of nearby gold
deposits which share strategic
synergies
• Commence discussions with
major companies requiring
supplemental high-grade mill
feed within commercial trucking
distance
TESTING RESOURCE AND
EXPANSION TARGETS
• Commencing multiple programs
testing resource expansion
• Planning additional drilling
campaigns focused on west-
plunging high-grade structures
• New Mineral Resource Estimate
– incorporating stricter grade
threshold while maintaining
continuity of mineralised
structures
20
1. Geological Background
Piché Group – Cadillac-Larder Lake Fault Zone
The Piché Group, a volcanic and ultramafic sequence in the Abitibi
Greenstone Belt, is one of the most important host rock groups along
the Cadillac-Larder Lake Fault Zone – also known as the Cadillac Break.
Several famous gold mines along this break are either hosted
in or structurally controlled by the Piché Group. These mines are
concentrated in the Val-d’Or to Rouyn-Noranda corridor in Québec.
Famous mines along the Cadillac Break hosted in the Piché Group:
1. LaRonde Mine – Agnico Eagle
P&P=2.74Moz, MI&I=2.76Moz, >3.0km mining depth
Ore: Gold, silver, zinc, copper, lead
Geology: Hosted in volcanic and volcaniclastic rocks of the Piché Group and adjacent units.
Gold is associated with massive sulphide lenses and vein systems, often within or near sheared
ultramafics.
Source: https://www.agnicoeagle.com/English/operations-and-projects/global-operations-and-
development-projects/laronde-complex/default.aspx
2. Lapa Mine (now closed) – Agnico Eagle
P&P=0.04Moz, MI&I=0.26Moz, ~1.4km mining depth
Ore: High-grade gold
Geology: Located directly on the Cadillac Break. Hosted in sericitized ultramafics and volcanics of
the Piché Group. Gold occurs in quartz-carbonate veins within tight shear zones.
Source: https://www.sec.gov/Archives/edgar/data/2809/000104746917002009/a2231316zex-
99_1.htm
3. Bousquet Mine Complex (includes Bousquet 1, 2 & 3, and LaRonde Zone 5) – Agnico Eagle
3.87Moz Historical Production, 1.25km depth
Ore: Gold with polymetallic components
Geology: Hosted in Piché Group mafic to ultramafic volcanics and tuffs.
Gold associated with pyrite and chalcopyrite in altered volcanic host rocks.
Source: https://www.mindat.org/loc-206837.html
4. Doyon-Westwood Complex – IAMGOLD
P&P=1.04Moz, MI&I=3.51Moz, 2.2km mining depth
Ore: High-grade gold
Geology: Partly hosted in rocks of the Piché Group, particularly altered ultramafics along the
Cadillac Break. Structurally controlled quartz veining in sheared volcanics.
Source: https://www.iamgold.com/English/operations/westwood/default.aspx
5. Augmitto-Astoria (Rouyn Gold Project) – Lac Gold
MI&I=1.66Moz, drilled to 400-600m depth
Ore: Gold
Geology: Hosted in ultramafic flows and tuffs of the Piché Group.
Alteration includes carbonate, sericite, fuchsite, and quartz veins along shears.
1 & 4
2
3
5
21
1. Geological Background
Extensional vein sets
• Focused drilling aimed at high-grade
extensional vein sets beneath known
mineralization
• Bonanza-grade extensional veins are
commonly missed by conventional drilling—
representing significant upside
• Down-plunge targeting offers potential to
unlock ultra-high-grade zones
Vertical Section
8200mE with
Proposed Drill Hole
22
September 2023 Indicated Inferred Total
Astoria1
Tonnage (Mt) Grade (g/t) Gold Ounces (koz) Tonnage (Mt) Grade (g/t) Gold Ounces (koz) Tonnage (Mt) Grade (g/t) Gold Ounces (koz)
Ultramafic 2.9 3.16 293 3.7 3.28 386 6.5 3.23 679
Argillite 0.5 3.88 60 0.4 4.56 51 0.8 4.17 112
Sub-Total 3.4 3.27 353,657 4.0 3.40 437 7.4 3.34 791
Augmitto-Cinderella2
Tonnes Grade (g/t) Ounces Tonnes Grade (g/t) Ounces Tonnes Grade (g/t) Ounces
Ultramafic 1.9 3.54 214 1.0 2.94 94 2.9 3.33 308
Argillite 0.1 2.62 10 0.4 3.73 43 0.5 3.45 53
Sub-Total 2.0 3.48 224 1.4 3.15 137 3.4 3.35 361
LAC Gamble3
Tonnes Grade (g/t) Ounces Tonnes Grade (g/t) Ounces Tonnes Grade (g/t) Ounces
Ultramafic 3.7 3.27 391 1.0 2.73 84 4.7 3.16 475
Argillite 0.1 2.31 8 0.3 3.22 31 0.4 2.98 39
Sub-Total 3.8 3.24 398 1.3 2.85 116 5.1 3.14 514
Rouyn Gold Project Total 9.2 3.30 976 6.6 3.24 690 15.8 3.28 1,666
Kasagiminnis (Pickle Lake) - - - 0.8 4.3 110 0.8 4.3 110
Notes:
Due to the effects of rounding, totals may not represent the sum of all components.
“Refer to Appendix 1 (JORC Table 1) of the accompanying company announcement for further details on the Mineral Resource Estimates
Rouyn Gold Project
Compiled from 1,460 drill holes for a total of 190,622m.
Resource estimated by ERM using US$2,200 gold price and various crown pillar assumptions.
Cut-off grades – Ultramafic: 1.72g/t, Argillite: 2.07g/t
Rouyn Gold Project Recovery Assumptions
1. Astoria assumes 96% recovery for Ultramafic and 80% recovery for Agillite
2. Augmitto-Cinderella assumes 96% recovery for Ultramafic and 90% recovery for Agillite
3. LAC Gamble assumes 96% recovery for Ultramafic and 80% recovery for Agillite
2.Mineral Resource Estimates (JORC 2012)
23
Competent Person’s Statement
Kasagiminnis Mineral Resource
The information in this presentation that relates to JORC Mineral Resources for the Pickle Lake Gold Project has been extracted from Ardiden's
accompanying ASX announcement entitled “Maiden High-Grade Gold Resource at Pickle Lake" dated 10 September 2019, a copy of which is available at
www.asx.com.au. Ardiden confirms that it is not aware of any new information or data that materially affects the information included in that
announcement and, in relation to the estimates of Mineral Resources, confirms that all material assumptions and technical parameters underpinning the
estimates in that announcement continue to apply and have not materially changed. Ardiden confirms that the form and context in which the
Competent Persons' findings are presented have not been materially modified from the announcement.
Competent Person’s Statement
Rouyn Mineral Resource
The information in this announcement that relates to Mineral Resources for the Rouyn Gold Project has been extracted from the ASX announcement
titled “Ardiden and Lac Gold to Create a Leading Canadian Gold Exploration and Development Company” released on 10 October 2025 and available at
www.asx.com.au. Ardiden Ltd confirms that it is not aware of any new information or data that materially affects the information included in that
announcement, and that all material assumptions and technical parameters underpinning the estimates in that announcement continue to apply and
have not materially changed. Ardiden Ltd also confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from that announcement.
3.Competent Person’s Statement