Drilling Intersects Higher Grade and Extends Trend
Released
Released
Announcement PDF
7 August 2023
ARDIDEN FURTHER DRILLING AT DOROTHY INTERSECTS HIGHER-GRADE
MINERALISATION AND EXTENDS MINERALISED TREND
Highlights Include:
o
Expanded drill program has increased the strike length by 100m to the SE, taking the total
length of higher-grade mineralisation to 600m.
o
Planning is underway for a high-resolution magnetic geophysics survey and geological
review covering the Dorothy and Dobie prospects portion of the Western Hub.
o
A comprehensive review of all field costs is also underway to explore available options to
reduce overall costs, enabling the drilling of more meters.
o
West Zone results include confirmation of gold mineralisation in a new area of testing.
Dorothy SE.
o
DR-23-20
3.34m @ 3.22 g/t from 56.66m, within a broader envelope of
43.90m @ 0.40 g/t from 56.66m
o
DR-23-21
3.05m @ 2.99 g/t from 64.00m within a broader envelope of
21.69m @ 0.46 g/t from 64.00m
o
DR-23-12
3.00m @ 2.15 g/t from 52.00m within a broader envelope of
28.00m @ 0.38 g/t from 46.00m
o
DR-23-19
2.65m @ 0.93 g/t from 260.60m within a broader envelope of
43.25m @ 0.25 g/t from 220.00m
DR-23-37
16.00m @ 0.91 g/t from 2.00m, and 20.67m @ 0.71 g/t from 23.00m
within a broader envelope of 149.00m @ 0.31 g/t from 2.00m
West Zone
o
Greg Romain, MD & CEO, commented:
“The results to date at Dorothy continue to build on the thesis that the geology in the Western Hub of the
Pickle Lake Project is potentially significant. The sheer complexity of the types of mineralisation we are
encountering, the importance of the historical results, and the length of the strike we are trying to understand
necessitates much deeper thought. Given the early stage and the new expertise I recruited to the project, we
will take the required time to better understand the historic work completed in the region, including the
geology at the historic Golden Patricia Mine. We plan to undertake a high-resolution magnetic geophysics
survey to build a more robust plan for future drill programs. We will also use this time to undertake a
comprehensive review of our drilling costs, including logistics, to reduce overall costs in order to drill more
meters. I look forward to providing an update on our fall drill program as soon as it is available.”
1|P age
Ardiden Limited (ASX: ADV) (“Ardiden” or “the Company”) is pleased to announce final assay results from its
2023 spring drill campaign at its 100% owned District-Scale Pickle Lake Gold Project located in the well-endowed
Uchi Geological sub-province east of Red Lake in Northwestern Ontario, Canada (Figure 6).
2023 Exploration Program
Drilling commenced in early March 2023 with all holes planned to test the tertiary structure, herein referred to
as the Dorothy Dobie trend, at the Dorothy Prospect. The Dorothy Dobie trend extends from the New Patricia
Prospect through the historic Golden Patricia Mine which produced 619,796 oz Au @ 15.2 g/t Au1 between
1988-1997 travelling northwest (NW) towards and beyond the Company’s West Prospect, spanning >35kms.
(Figure 1)
Figure 1 – Ardiden’s Western Hub which includes the Dorothy Dobie Prospects, Esker, Cooper, Meen, Tonsil, West
which are along strike to the past producing Golden Patricia Mine.
The 34-hole diamond drill program totalled 5,473m, and was designed to test the extent of the mineralisation
halo, along with the affinity to the presumed iron formation related sulphide sequence identified in Ardiden’s
2022 drill program at both the Dorothy and Dobie prospects (Figure 2). The assay results reported within, and
including the first eight holes announced on 11 May 2023, continue to drive the development of the Company’s
geological model, whilst adding further strength to our understanding of the shallow mineralisation zones within
the Dorothy-Dobie Trend.
Initial results received from the first 8 holes led to an extension of the program towards a prospect historically
known as the West Prospect, located approximately 1.6 km to the NW of the Dorothy Prospect. The extension
of both depth, number of holes, and strike length was in response to the positive results from the first eight drill
holes announced on 11 May 2023. (Figure 3) and included four holes at the West Prospect.
1
Information in relation to historical gold production at the Pickle Lake Gold Camp, and Golden Patricia Mine in Figures and notes above have been referenced from three sources of publication, namely:
1. Harron, G. A. 2009. Technical Report on Three Gold Exploration Properties Pickle Lake Area, Ontario, Canada. G.A. Harron, P.Eng., G.A. Harron & Associates Inc.
2|P age
Figure 2 – Project location map for the Dorothy Prospect with drill collars in reference to drilling results displayed in this announcement.
Figure 3 – Current drill plan over the Dorothy and West Prospect, results as part of this announcement in blue, historical results in white as
announced by Ardiden (ADV) ASX: 17 August 2022, ASX: 26 September 2022, and ASX: 11 May 2023.
3|P age
Drill results with the most significant intercepts of the holes reported in this announcement from Dorothy and
West are provided in Table 1 at a 0.2g/t Au cut-off.
Results of the expanded drilling program have increased the strike length of the highly prospective zone by 100m
to the SE taking the total length of higher-grade mineralisation to 600m, added an additional 100m to the broad
NW Dorothy zone, and confirmed gold mineralisation in a new area of testing at the West Prospect.
In addition to the broad mineralisation zone at Dorothy and West, the continuation of higher-grade intervals
appears present within the Dorothy-Dobie Trend. Importantly, they are very shallow depths with all intersecting
the zone at less than 75m from surface. The results reported below confirm higher-grade intervals within the
broader mineralised zones of:
• DR-23-12 with 3.00m @ 2.15 g/t from 52.00m,
• DR-23-20 with 3.34m @ 3.22 g/t from 56.60m, and
• DR-23-21 with 3.05m @ 2.99 g/t from 64.00m.
The Dorothy Prospect currently displays a highly prospective zone with a strike length of 600m along the
Dorothy-Dobie Trend. This prospective area includes the previously reported holes DR-23-04A through to DR23-11 (ASX announcement 11/05/23) and DR-22-01 and DR-22-02 (ASX announcements 17/08/22 and
22/09/22). The trend appears to be SE-NW trending and dipping shallowly to the NW and the mineralisation
within this zone remains open at depth. All results within the zone are at very shallow depths with all intersecting
the zone at less than 75m from surface. The Company is also developing a greater understanding of the strike
extension to link the Dorothy and West Prospects.
Figure 4 – Drill results highlighting the prospective 600m strike length at the SE Dorothy Zone
Drilling conducted beyond this prospective area at Dorothy displays lower grades of mineralisation along the
Dorothy-Dobie Trend but extends for over 2km. Whilst this remains early stages at Dorothy and West, the
presence of gold appears consistent in 31 of the 34 holes drilled in the current program. Holes DR-23-19 through
to DR-23-21 are situated up to 400m to the SE of the prospective zone and displayed results that require further
review and follow-up assessment with a broad mineralisation envelope of up to 43.90m @ 0.40 g/t (DR-23-21)
4|P age
that also appears consistent with a narrow higher-grade zone of 3.34m @ 3.20 g/t (Figure 5). The new holes to
the SE of Dorothy extend the total strike length containing higher grade incepts to circa 600m providing a very
strong target at depth for further drill testing.
The four drill holes at the West Prospect (DR-23-34/DR-23-37) intercepted shallow mineralisation from surface.
These holes were designed to test historical results completed at this prospect in 1988. Importantly,
mineralisation commenced in DR-23-37 at 2m once traversing the overburden with mineralisation at the top of
the hole before finishing at 152m with mineralisation continuing. Mineralisation appears unlike the drilling at
Dorothy and was not conducive to the host diorite sequence but within a series of meta volcanics, altered
basalts, and gabbro’s. The West Prospect, at approximately 1.6km NW of the Dorothy Prospect, is thought to be
a mineralised splay off the Dorothy-Dobie Trend.
Figure 5 - Drill results highlighting gold mineralisation at the newly tested West Zone
Further work is planned to better understand this area with the 600m prospective strike length at Dorothy, and
newly discovered mineralisation at the West Zone. The Company is planning to conduct a low-level high
resolution geophysical survey across the remainder of the Western Hub to assist in defining the current
structural and geological model. Commencement of the survey has been delayed due to the availability of
helicopters because of the unusually high number of forest fires in Canada this summer. We continue to monitor
the situation and it appears the number of fires have started to decrease which will result in the availability of
helicopters in the coming weeks.
In addition to the low-level high resolution geophysical survey being planned, planning is underway for field
mapping activities prior to snow setting in.
Field Costs Review
The Company, with the assistance of a third party, is undertaking a thorough review of its field costs and logistics
to find ways to reduce costs including the use of a helicopter. With the Company anticipating drilling in this area
for an extended period, it is imperative to look at every opportunity to minimize costs, which will directly result
in more meters being drilled.
5|P age
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets at the Pickle Lake
Project is based on, and fairly represents, information and supporting documentation prepared by Mr Haydn
Daxter, a Member of the Australian Institute of Geoscientists. Mr Daxter is a full-time employee at Ardiden
Limited. Mr Daxter has sufficient experience which is relevant to the style of mineralisation and type of deposit
and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Daxter
consents to the inclusion in this report of the matters based on this information in the form and context in which
it appears.
This information is authorised for ASX release by the Board of Directors.
ENDS
For further information:
Investors:
Greg Romain
CEO and Managing Director
Tel: +1 647 300 5417
info@ardiden.com.au
Stephen Moloney
Corporate Storytime
Tel +61 403 222 052
stephen@corporatestorytime.com
More information is available from the Company’s website: www.ardiden.com.au
About Ardiden:
Ardiden is focused on systematic gold exploration at its 100%-Owned Pickle Lake Gold Project in the well-endowed Uchi
Geological Subprovince of Northwestern Ontario, Canada. The Company’s 1,088 km2 District-Scale Gold Project is the largest
continuous gold land holding in the Uchi Belt, where Barrick, Newmont, Kinross, and Evolution all hold significant gold mine
and exploration assets. Ardiden’s strategic landholding is situated on the same geological belt as Red Lake, the ‘Uchi’
Subprovince, which has produced over 30M oz of gold to date and where new Tier-1 gold discoveries are still being made,
such as Great Bear Resources’ Dixie Project, which is now under new ownership following the successful CAD$1.6 billion
acquisition by Kinross (Figure 6). In addition to its Pickle Lake Gold Project, Ardiden has retained ~13 million shares in Green
Technology Metals (ASX:GT1) which it acquired as part proceeds from the sale of Ardiden’s lithium assets.
Figure 6 – Location of Ardiden’s Pickle Lake Gold project within the Uchi Belt of northwest Ontario 2
2
Source S&P Global Market Intelligence 2023
6|P age
APPENDIX A: DRILLING RESULTS
Intervals with ≥0.2 g/t gold are reported as down-hole intervals and lengths.
Hole ID
Easting
Northing
Elevation
Hole
length
(m)
Dip
Azimuth
NAD83
To
From (m)
(m)
Significant
intersections
Interval
Grade
(m)
(gold g/t)
Dorothy Prospect
46.00
DR-23-12
DR-23-13
DR-23-14
DR-23-15
618031
618031
617496
617496
5697898
5697898
5698374
5698374
408m
408m
411m
411m
161
218
161
176
-55.4
-70.7
-54.8
-70.3
207.30
208.43
207.30
207.10
DR-23-16
617394
5698482
412m
155
-59.2
208.50
DR-23-17
617394
5698482
412m
152
-74.95
209.12
DR-23-18
618194
5697779
405m
194
-60
206.80
74.00
28.00
0.38
including 3.00m @ 2.15 g/t from 52.0m
96.00
96.50
0.50
1.31
155.30
158.00
2.70
3.41
62.00
108.08
46.08
0.20
including 2.30m @ 1.31 g/t from 63.0m
131.00
131.52
0.52
1.67
165.00
167.72
2.72
0.37
23.00
27.71
4.71
0.43
134.00
134.34
0.34
0.33
37.00
39.00
2.00
0.26
43.00
43.85
0.85
0.46
165.10
165.56
0.46
0.24
48.00
53.00
5.00
0.45
131.85
132.70
0.85
0.62
70.00
73.67
3.67
0.24
76.00
78.52
2.52
0.20
91.50
94.28
0.98
0.32
102.30
103.12
0.82
0.36
113.60
114.30
0.70
0.23
147.76
152.40
4.64
0.37
including 0.67m @ 2.47 g/t from 151.73m
DR-23-19
618193
5697778
405m
278
-75.4
207.00
27.00
28.80
1.80
0.20
151.00
152.32
13.2
1.35
179.00
181.90
2.90
2.68
220.00
263.25
43.25
0.25
including 2.65m @ 0.93 g/t from 260.60m
DR-23-20
618305
5697594
405m
137
-60.2
226.50
DR-23-21
618305
5697594
405m
149
-75.27
226.50
DR-23-22
618377
5697522
405m
122
-60.2
218.50
DR-23-23
618377
5697522
405m
167
-75.2
218.50
DR-23-24
618688
5697135
404m
139
-69.6
224.90
DR-23-25
618688
5697135
404m
176
-84.5
240.50
56.66
100.56
43.90
0.40
including 3.34m @ 3.22g/t from 56.66m
64.00
85.96
21.96
0.46
including 3.05m @ 2.99 g/t from 64.00m
74.82
76.08
1.26
1.31
40.00
42.00
2.00
0.20
117.00
118.00
1.00
0.56
61.00
62.00
1.00
0.26
61.00
78.00
17.00
0.21
including 5.00m @ 0.51 g/t from 65.00m
7|P age
Hole ID
DR-23-26
DR-23-27
DR-23-28
DR-23-29
Easting
618575
618575
618481
618482
Northing
5697308
5697308
5697410
5697410
Elevation
405m
405m
404
404m
Hole
length
(m)
Dip
119
-60.1
143
119
143
DR-23-30
617160
5698690
411m
122
DR-23-31
617160
5698690
411m
DR-23-32
617007
5698824
410m
DR-23-33
617007
5698824
410m
-74.2
-58.48
-74.9
Azimuth
NAD83
225.40
225.40
235.52
225.40
To
From (m)
(m)
Significant
intersections
Interval
Grade
(m)
(gold g/t)
24.05
24.38
0.33
0.98
36.25
37.75
1.50
0.43
105.13
107.25
2.12
0.67
41.00
43.15
2.21
0.23
107.55
110.80
3.25
0.61
69.00
70.00
1.00
2.02
75.80
77.50
1.25
0.31
98.14
100.00
1.86
0.99
26.57
27.1
0.53
0.37
88.00
89.00
1.00
0.21
108.00
109.00
1.00
0.28
117.00
119.00
2.00
0.25
128.00
130.00
2.00
0.33
-58.79
220.20
No significant results
170
-73.8
218.30
No significant results
119
-43.56
210.33
No significant results
152
-65.3
210.25
52.00
53.00
1.00
0.55
60.00
92.00
32.00
0.22
including 1.00m @ 1.91 g/t from 71.00m
including 1.00m @ 2.96 g/t from 91.00m
DR-23-34
616524
5698969
407m
131
-59.9
225.10
66.00
67.00
1.00
0.24
71.00
112.00
41.00
0.20
including 4.00m @ 0.98 g/t from 108.00m
DR-23-35
616524
5698969
407m
164
-74.35
224.87
91.00
92.00
1.00
0.36
98.00
100.00
2.00
0.21
126.00
128.00
2.00
0.27
143.52
162.00
18.48
0.24
including 0.98m @ 1.24 g/t from 143.52m
DR-23-36
616379
5698959
407m
131
-64.9
223.20
2.00
616379
5698959
407m
152
-80.85
220.34
21.00
0.44
including 5.25m @ 1.14 g/t from 10.00m
2.00
DR-23-37
23.00
152.00
149.00
0.31
including 16.00m @ 0.91 g/t from 2.00m
including 20.67m @ 0.71 g/t from 23.00m
including 12.90m @ 0.61 g/t from 50.00m
8|P age
JORC Code, 2012 Edition – Table 1
JORC Code Table 1 Criteria - The table below summaries the assessment and reporting criteria used for the Dorothy sampling techniques and data
guidelines in Table 1 of The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code, 2012).
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
•
•
techniques
•
•
•
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as downhole gamma sondes, or
handheld XRF instruments, etc.). These samples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.
•
•
•
•
•
•
•
•
•
Drilling
techniques
Drill sample
recovery
•
•
•
•
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
•
•
•
•
•
Logging
•
•
•
Sub-sampling
techniques and
•
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
•
•
•
•
Samples have been collected by diamond drilling techniques
(see below).
Drillholes are orientated perpendicular to the interpreted
strike of the mineralised trend except where limited access
necessitates otherwise.
Diamond core sampled in intervals of ~1 m where possible,
otherwise intervals less than 1 m selected based on
geological boundaries.
The core was logged, cut, and sampled by qualified personnel
and samples submitted to AGAT Laboratories (AGAT) in
Ontario.
Sampling protocols determined the sampler to collect the
sample on the left-hand side of the core to eliminate
selective sampling.
Prior to shipping, all samples were routinely subjected to
wet/dry weight SG determination by qualified personnel. All
samples received by AGAT were crushed to 75% passing 2-10
mm mesh sieve. This was then riffle split to a 250 g sample
which was pulverised to 85% passing 75 microns.
A 30 g subsample was Fire Assayed for gold by AGAT.
Another 0.5g subsample was analysed for Ag, Al, As, B, Ba,
Be, Bi, Ca, Cd, Co, Cr, Cu, Fe, Ga, Hg, K, La, Mg, Mn, Mo, Na,
Ni, P, Pb, S, Sb, Sc, Sr, Te, Ti, Tl, U, V, W, Y, Zn, Zr by Aqua
Regia digest and ICP by AGAT.
All samples containing visible gold were sent for metallic
screen analysis.
These techniques are considered appropriate for the
mineralisation expected at all properties.
All samples and geological information have been derived
from diamond core using standard equipment of NQ size (47.6
mm diameter).
The drill holes were completed by CYR Drilling of Manitoba in
2023.
The drill core was oriented by CYR Drilling and verified by
Ardiden personnel.
All drill core was measured and compared to actual drilled
depths on a run-by-run basis by the company geologist and
driller to determine core recovery and Rockmass Quality Data
(RQD). Recoveries averaged higher than 98% with the only
loss of material coming from the overburden. This horizon is
not considered prospective for Ardiden Ltd’s purposes.
Core recovery through the mineralized zones is greater than
98%.
No sample bias was observed.
All diamond core has been marked up, inspected, logged and
photographed by suitably trained and qualified personnel.
Logging detail includes depth, hole orientation, lithology,
alteration, veining, mineralogy, mineralisation, RQD, magnetic
susceptibility and structure. These methods involve a
combination of both qualitative and quantitative
determinations.
Diamond core was logged in its entirety.
All samples have been derived from NQ diamond core and have
been cut in half or quarter using a standard core saw. Foliation
is aligned perpendicular to the cut. This technique is considered
9|P age
Criteria
JORC Code explanation
sample
preparation
•
•
•
•
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
Commentary
•
•
•
•
•
Quality of assay
•
data and
laboratory tests
•
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
•
•
•
•
•
•
•
•
•
•
Verification of
sampling and
assaying
•
•
•
•
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
•
•
•
•
Location of data
•
points
•
•
Accuracy and quality of surveys used to locate drillholes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
•
•
•
•
•
•
Data spacing and
distribution
•
•
Data spacing for reporting of Exploration Results.
Whether the data spacing, and distribution is sufficient
to establish the degree of geological and grade
•
•
appropriate for the mineralisation observed at the properties.
Field duplicates (half-core cut in half again) have been
submitted to the assay laboratory at a rate of 1:20 to evaluate
the sampling technique as per standard industry practise.
Ardiden has retained and stored all remaining half-core
samples for future reference/use.
Sample preparation follows industry best practice standards
and is conducted by internationally recognised and certified
laboratories.
Quality control samples inserted include field duplicates (1 in
20), standards (1 in 20) and blanks (1 in 50).
Sample sizes are consistent with industry standards and are
considered appropriate for the mineralisation.
ALS and AGAT are certified laboratories (ISO/IEC 17025
accredited) and subject to internal QAQC processes.
ALS and AGAT digest processes are considered total and
appropriate for this style of mineralisation.
Ardiden determined SG values have been derived from wholesample wet/dry weights using a suitable set of electronic scales
as per industry standard practise.
Geophysical tools have not been used.
Field duplicates have been inserted at a ratio of 1:20 samples.
Samples of Certified Reference Material (CRM) for gold and
blanks have been inserted into the sample stream at a ratio of
1:20 and 1:50 for respectively.
ALS and AGAT are subject to their own internal QAQC
determinations. A duplicate sample is generated for crushed
samples at a rate of 1 in 50. Another duplicate for pulverised
samples is generated at a rate of 1 in 50.
Laboratory instruments are calibrated every 42 samples.
Laboratory blanks (x 2), certified reference materials (x 2) and
sample duplicates (x 3) were analysed within every 42 samples
in the batch tray.
Ardiden has reviewed the QAQC results, and they are
considered acceptable.
Results have been reviewed by the Exploration Manager
(Competent Person). The data is imported into Micromine
software for visual checks and database validation by the
Competent Person.
Twinned holes have not been employed as a check to the
current program at this stage.
Sample results have been merged into Company’s database by
Ardiden personnel.
All data is electronically logged in Access and stored on the
Company’s database. A master copy of this data exists on the
Ardiden Ltd server in Australia.
No adjustments have been made to the assay data.
The 2023 program of drilling was subject to suitable location
and orientation techniques given the technically difficult nature
of the location and magnetic lithologies.
Initially, drill hole locations were surveyed in NAD83-15 using a
hand-held GPS and notes have been recorded on how these
locations relate to existing drill holes and clearings.
All drill collars will be collected with a DGPS at the end of the
drill campaign.
The drill rig was aligned to planned azimuth using a Axis
automatic positioning system (APS), a satellite seeking
instrument prior to collaring.
Downhole surveys were conducted using a true north seeking
Axis Gyro multishot tool. This instrument records dip, true
north azimuth, and temperatures. This tool is not affected by
magnetism.
Surveys were all calculated to UTM Grid North (NAD83 Zone
15) based on grid convergence angles.
Diamond drill hole locations have been selectively targeting
mineralisation based on regional orientations known along
strike.
Mineral Resource estimate has not been prepared.
10 | P a g e
Criteria
Orientation of
JORC Code explanation
•
•
data in relation
to geological
structure
•
Commentary
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
•
No sample composites have been created.
•
Due to the difficulty in mobilising and moving drill rigs at all
sites, a series of holes were fan drilled from one location. Both
dip and azimuth changes were performed. Thus, it will be rare
that any drill hole will intersect the mineralisation in a purely
perpendicular manner.
There is no expected assay bias resulting from the orientation
of drilling due to the nature of mineralisation observed at all
locations.
Diamond drill core was transported from site by a contractor to
a secured core processing facility for cutting and sampling.
Samples are subsequently sent by a contractor to the assay
laboratory.
A full sample review was conducted prior to writing sampling,
logging and QAQC procedures for all Ardiden Ltd personnel.
These procedures were then used for the current program and
supervised internally by Ardiden Ltd personnel in charge of the
due-diligence program.
•
Sample security
•
The measures taken to ensure sample security.
•
Audits or reviews
•
The results of any audits or reviews of sampling
techniques and data.
•
•
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
•
•
and land tenure
status
•
Exploration done
•
by other parties
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical
sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
Acknowledgment and appraisal of exploration by other
parties.
•
•
•
•
Geology
•
Deposit type, geological setting and style of
mineralisation.
•
•
•
•
The Dorothy Dobie deposit consists of 327 granted Mining
Claims totalling 58.82km2 and hosts the Dorothy, Dobie, West,
Cooper, and Tonsil Prospects.
Ardiden Limited owns the tenements 100% for Dorothy Dobie.
There are no known issues affecting the security of title or
impediments to operating in the area.
The Dorothy Dobie Project area is part of the regional Pickle
Lake Project, which is located within the Pickle Lake area,
Kenora (Patricia) Mining Division, Ontario. Significant gold
deposits include the historical Pickle Crow Gold Mine.
Over 25,000 m of historical diamond drilling was completed
across the Pickle Lake Gold Properties by previous owners,
confirming the potential for multiple extensive gold mineralised
zones at the Dorothy-Dobie Lake and Kasagiminnis Lake (both
part of Ardiden Ltd’s Pickle Lake Project), with gold
mineralisation at both of these prospects remaining open along
strike and at depth.
The Pickle Lake Project is located within the Meen-Dempster
greenstone belt and the adjoining Pickle Lake greenstone belt,
which contain the known gold deposit (Kas
Share your feedback
Discover