Visible Gold Observed in Drillhole AS-26-793 at Rouyn
1 | P a g e
29 April 2026 | ASX: ADV
Visible Gold Observed in Drillhole AS-26-793 at Rouyn Gold Project
Visible gold observed within structurally controlled mineralisation at the Astoria deposit
Key Highlights
Visible gold observed in drill hole AS-26-793 between 152.05 – 152.20m down hole
Visible gold observed as coarse flakes of up to 7mm in length
Mineralisation occurs within a broader zone of quartz-carbonate-chlorite veining and alteration,
interpreted to be Piché Group ultramafic volcanics
Assay results are anticipated in late May
The Company cautions that visual estimates of mineral abundance, including visible gold, should never be
considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of
principal economic interest.
Visual estimates also potentially provide no information regarding impurities or deleterious physical properties
relevant to valuations.
The Company will update the market when laboratory analytical results become available, expected late May.
Figures 1 and 2 – Visible gold in quartz veining, drill hole AS-26-793 (~152.05m), Astoria, Rouyn Gold Project
2 | P a g e
Commentary
Managing Director Andrew Stocks commented:
“The observation of visible gold in hole AS-26-793 is consistent with our geological model at Astoria and
provides further confidence in the presence of a structurally controlled gold system.
Importantly, the visible gold occurs within a broader zone of quartz-carbonate veining and alteration,
which is typical of orogenic gold systems in the Abitibi Belt. While we await assay results, these
observations provide additional geological context to the ongoing drilling program.”
Ardiden Limited (ASX: ADV) (Ardiden or the Company) advises that, as part of its ongoing diamond drilling
program at the Astoria deposit within the Rouyn Gold Project, Québec, visible gold has been identified in drill
hole AS-26-793.
The observation follows recent drilling results which have confirmed the continuity of mineralisation at Astoria
and provides additional geological context to the evolving understanding of the system.
Geological Context – Astoria
Drill hole AS-26-793 was designed to evaluate the lateral limits of the Astoria system and further delineate the
boundaries and consistency of mineralization. The hole intersected a sequence of polygenic conglomerates
before entering the target Piché Group ultramafic volcanics at approximately 148.15m (downhole). The lower
portion of the hole is characterized by variably foliated and brecciated carbonatized ultramafics.
A quartz vein system, intersected at ~152.05m, contains visible native gold occurring as coarse flakes (ranging
from 1mm to 7mm) within the vein material. This zone is associated with a broader interval of strong
hydrothermal alteration, summarized as follows:
Veining: 10–40% quartz-chlorite-tremolite brecciated veins
Sulphides: No significant sulphides observed
Alteration: Pervasive carbonate, tremolite, and chlorite with minor biotite
Visible Gold: 1mm to 7mm flakes on micro-fractures associated with chlorite-tremolite
The observed mineralization is consistent with structurally controlled orogenic gold systems along the Cadillac–
Larder Lake Break. While the occurrence of visible gold supports the interpreted continuity of high-grade zones
in this area, the Company cautions that visual observations are qualitative in nature and should not be
considered a substitute for laboratory analysis. The geological environment where the visible gold was observed
has not yet been systematically sampled, and final grade and width will be confirmed upon the receipt of
pending assay results.
3 | P a g e
Figure 3:
Astoria Cross-Section E64597
Figure 4: Astoria plan of drill hole locations
4 | P a g e
Next Steps
Core from AS-26-793 will be submitted to AGAT Laboratories for fire assay analysis.
Given the presence of coarse visible gold, screened and fraction splits fire assay methods have been requested
to isolate the impact of coarse grain gold.
Results are expected within approximately four weeks.
This information is authorised for ASX release by the Board of Ardiden Limited.
For further information:
Andrew Stocks Matthew Keegan
Managing Director Executive Director
Tel: +61 8 6184 5938
investors@ardiden.com.au
Engage with this announcement at the Ardiden Investor Hub.
Or visit the Company’s website at www.ardiden.com.au
About Ardiden
Ardiden Limited (ASX: ADV) is a Canadian-focused gold exploration and development company. Following
completion of its merger with Lac Gold Limited, Ardiden holds a 100% interest in the Rouyn Gold Project
(Québec) and the Pickle Lake Gold Project (Ontario).
The Company’s strategy is to advance high-quality gold assets through disciplined technical execution,
structured economic evaluation and responsible stakeholder engagement. By systematically de-risking its
projects and progressing through defined development stages, Ardiden aims to narrow the valuation gap
relative to its peer group and deliver sustainable value for shareholders.
Mineral Resource Estimate – Rouyn Gold Project, Québec
Classifica on Material type
Au cut-off
(g/t)
Tonnage
(Mt)
Gold
(g/t)
Gold Ounces
(koz)
Indicated Ultramafic 1.72 8.5 3.29 898
Argillite 2.07 0.7 3.43 78
Total Indicated 9.2 3.30 976
Inferred Ultramafic 1.72 5.6 3.13 565
Argillite 2.07 1.0 3.86 126
Total Inferred 6.6 3.24 690
Total Resource
(Indicated & Inferred)
15.8 3.28 1,666
Note: Due to effects of rounding, totals may not represent the sum of all components.
5 | P a g e
The Rouyn Gold Project currently hosts a Mineral Resource Estimate (JORC 2012), previously announced to the
ASX on 10 October 2025. Recent drilling has targeted extensions beyond the current Mineral Resource
envelope.
Forward-Looking Statements
This announcement may contain some references to forecasts, estimates, assumptions and other forward-
looking statements. Although the Company believes that its expectations, estimates and forecast outcomes are
based on reasonable assumptions, it can give no assurance that they will be achieved. They may be affected by
a variety of variables and changes in underlying assumptions that are subject to risk factors associated with the
nature of the business, which could cause actual results to differ materially from those expressed herein. All
references to dollars ($) and cents in this presentation are to Australian currency, unless otherwise stated.
Investors should make and rely upon their own enquires and assessments before deciding to acquire or deal in
the Company’s securities.
Competent Persons Statement – Exploration Results
The information in this report that relates to Exploration Results at the Rouyn Gold Project is based on, and
fairly represents, information and supporting documentation prepared by Ms Suzie Tremblay, P.Geo., a member
of the Ordre des géologues du Québec (OGQ), a Recognised Professional Organisation (RPO). Ms Tremblay is a
full-time employee of Explo-Logik Inc., an independent geological consulting firm engaged by Ardiden Limited.
Ms Tremblay has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity being reported to qualify as a Competent Person as defined in the 2012 Edition
of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
The Competent Person has reviewed the underlying data and confirms that it fairly represents the exploration
results reported.
Ms Tremblay consents to the inclusion in this report of the matters based on this information in the form and
context in which it appears.
Competent Person’s Statement Rouyn Gold Project – Mineral Resource Estimate
The information in this announcement that relates to Mineral Resources for the Rouyn Gold Project has been
extracted from the ASX announcement titled “Ardiden and Lac Gold to Create a Leading Canadian Gold
Exploration and Development Company” released on 10 October 2025 and available at www.asx.com.au.
Ardiden Ltd confirms that it is not aware of any new information or data that materially affects the information
included in that announcement, and that all material assumptions and technical parameters underpinning the
estimates in that announcement continue to apply and have not materially changed. Ardiden Ltd also confirms
that the form and context in which the Competent Person’s findings are presented have not been materially
modified from that announcement.
6 | P a g e
APPENDIX A: COLLAR INFORMATION FOR COMPLETED DRILL HOLE AS-26-793
Hole ID Prospect /
Target
Azimuth Dip Hole
Length (m)
Easting
(UTM
NAD83
Zone 17)
Northing
(UTM
NAD83
Zone 17)
RL (m) Status
AS-26-793
Astoria
West
180.09 -65.48 291 645971 5339924 304.7 Completed
APPENDIX B – Drill Log Of AS-26-793
7 | P a g e
JORC CODE, 2012 EDITION – TABLE 1
JORC Code Table 1 Criteria - The table below summarises the assessment and reporting criteria used for the Rouyn Gold Project sampling techniques and
data guidelines in Table 1 of The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code, 2012).
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as downhole gamma sondes, or
handheld XRF instruments, etc.). These samples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detail ed information.
Samples have been collected by diamond drilling techniques
(see below).
Drillholes are orientated perpendicular to the interpreted
strike of the mineralised trend except where limited access
necessitates otherwise.
Diamond core sampled in intervals of ~1 m where possible,
otherwise intervals less than 1 m selected based on
geological boundaries.
The core was logged, cut, and sampled by qualified personnel
at Explo-Logik core shack in Val D’Or and samples submitted
to AGAT Laboratories (AGAT) in Québec.
The same side of the core was consistently sampled to avoid
selective sampling bias.
Gold was analysed by fire assay (50 g) with atomic absorption
finish, while base metals were analysed by four-acid
digestion with ICP-OES finish. All samples received by AGAT
were crushed to 90% passing 2-10 mm mesh sieve. This was
then riffle split to a 250 g sample which was pulverised to
90% passing 75 microns.
Samples with gold grades greater than 10 g/t are reprocessed
using gravity finish. The processed material is split and
analysed by fire assay with ICP-OES finish to extinction. A
separate split is prepared to independently analyse
mineralized intervals with a target grade greater than 1.00%
Cu-Zn using a Na₂O₂ fusion with ICP-OES or ICP-MS finish.
All samples containing visible gold were sent for metallic
screen analysis.
These techniques are considered appropriate for the
mineralisation expected at all properties.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
All samples and geological information have been derived
from diamond core using standard equipment of NQ size (47.6
mm diameter).
The drill holes were completed by Forage Val d’Or of Québec
in 2026.
The drill core was oriented by Forage Val d’Or and verified by
Explo-Logik of Québec.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
All drill core was measured and compared to actual drilled
depths on a run-by-run basis by the company geologist and
driller to determine core recovery and Rockmass Quality Data
(RQD). Recoveries averaged higher than 98% with the only
loss of material coming from the overburden. This horizon is
not considered prospective for Ardiden Ltd’s purposes.
Core recovery through the mineralized zones is greater than
98%.
No sample bias was observed.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
All diamond core has been marked up, inspected, logged and
photographed by suitably trained and qualified personnel of
Explo-Logik.
Logging detail includes depth, hole orientation, lithology,
alteration, veining, mineralogy, mineralisation, RQD, magnetic
susceptibility and structure. These methods involve a
combination of both qualitative and quantitative
determinations.
8 | P a g e
Criteria JORC Code explanation Commentary
The total length and percentage of the relevant
intersections logged.
Diamond core was logged in its entirety.
Sub-sampling
techniques and
sample
preparation
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
All samples have been derived from NQ diamond core and have
been cut in half or quarter using a standard core saw. Foliation
is aligned perpendicular to the cut. This technique is considered
appropriate for the mineralisation observed at the properties.
Crushing stage duplicates have been submitted to the assay
laboratory at a rate of 1:20 to evaluate the sampling technique
as per standard industry practise.
Ardiden has retained and stored all remaining half-core
samples for future reference/use.
Sample preparation follows industry best practice standards
and is conducted by internationally recognised and certified
laboratories.
Quality control samples inserted include field duplicates (1 in
20), standards (1 in 20) and blanks (1 in 50).
Sample sizes are consistent with industry standards and are
considered appropriate for the mineralisation.
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
AGAT is a certified laboratory (ISO/IEC 17025 accredited) and
subject to internal QAQC processes.
AGAT digest processes are considered total and appropriate for
this style of mineralisation.
Explo-Logik determined SG values have been derived from
whole-sample wet/dry weights using a suitable set of electronic
scales as per industry standard practise.
Geophysical tools have not been used.
Field duplicates have been inserted at a ratio of 1:20 samples.
Samples of Certified Reference Material (CRM) for gold and
blanks have been inserted into the sample stream at a ratio of
1:20 and 1:50 for respectively.
AGAT is subject to their own internal QAQC determinations. A
duplicate sample is generated for crushed samples at a rate of 1
in 50. Another duplicate for pulverised samples is generated at
a rate of 1 in 50.
Laboratory instruments are calibrated every 42 samples.
Laboratory blanks (x 2), certified reference materials (x 2) and
sample duplicates (x 3) were analysed within every 42 samples
in the batch tray.
Explo-Logik has reviewed the QAQC results, and they are
considered acceptable.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Results have been reviewed by the Exploration Manager
(Competent Person). The data is imported into Micromine
software for visual checks and database validation by the
Competent Person.
Twinned holes have not been employed as a check to the
current program at this stage.
Sample results were imported into the company database
following validation checks by Explo-Logik.
All data is electronically logged in Access and stored on the
Company’s database. A master copy of this data exists on the
Ardiden Ltd server in Australia.
No adjustments have been made to the assay data.
Location of data
points
Accuracy and quality of surveys used to locate drillholes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
The 2026 program of drilling was subject to suitable location
and orientation techniques given the technically difficult nature
of the location and magnetic lithologies.
Initially, drill hole locations were surveyed in NAD83-17 using a
hand-held GPS and notes have been recorded on how these
locations relate to existing drill holes and clearings.
All drill collars will be collected with a DGPS at the end of the
drill campaign.
9 | P a g e
Criteria JORC Code explanation Commentary
The drill rig was aligned to planned azimuth using a Axis
automatic positioning system (APS), a satellite seeking
instrument prior to collaring.
Downhole surveys were conducted using a true north seeking
Imdex Omnix42 tool. This instrument records dip, true north
azimuth, and temperatures. This tool is not affected by
magnetism.
Surveys were all calculated to UTM Grid North (NAD83 Zone
17) based on grid convergence angles.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing, and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Diamond drill hole locations have been selectively targeting
mineralisation based on regional orientations known along
strike.
Mineral Resource estimate has not been prepared.
No sample composites have been created.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
There is no expected assay bias resulting from the orientation
of drilling due to the nature of mineralisation observed at all
locations.
Sample security The measures taken to ensure sample security. Diamond drill core was transported from site by Explo-Logik to
a secured core processing facility for cutting and sampling.
Drill core was stored in a secure facility prior to sampling.
Samples were subsequently sent by Explo-Logik to the assay
laboratory.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
A full sample review was conducted prior to writing sampling,
logging and QAQC procedures for all Ardiden Ltd personnel.
These procedures were then used for the current program and
supervised internally by Explo-Logik personnel in charge of the
due-diligence program.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical
sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
The Rouyn Gold Project comprises 73 Mining Claims and 1
Mining Concession which collectively host the Astoria, Lac
Gamble, Cinderella and Augmitto gold deposits.
The project carries a 2% NSR royalty, with an additional 0.5%
NSR on Cinderella, both held by Yorbeau Resources Inc., a TSX-
listed exploration company.
Ardiden Limited owns 100% of the mining claims and concession
through its wholly-owned Canadian subsidiary, Lac Gold (Rouyn)
Inc.
There are no known issues affecting the security of title or
impediments to operating in the area.
Exploration done
by other parties
Acknowledgment and appraisal of exploration by other
parties.
The Rouyn Gold Project has over 100 years of exploration and
production history. Over 2,428 diamond drill holes totalling
436,678 m has been completed historically confirming the
presence of multiple extensive gold mineralized zones.
Historical drilling and exploration data have been reviewed
where possible through examination of drill logs, assays and
available digital databases.
ERM International Group Limited has defined a Mineral
Resource Estimate of 1.66Moz Au @ 3.28g/t Au in compliance
with the JORC Code (2012). Refer to the Mineral Resource
10 | P a g e
Criteria JORC Code explanation Commentary
Estimate summary table on page 6 of this announcement.
Ardiden confirms it is not aware of any new information or data
that materially affects the information included in that
announcement.
Geology Deposit type, geological setting and style of
mineralisation.
The Rouyn Gold Project is classified as an orogenic gold
deposit. The Project is located on the Lake Larder Cadillac Fault
Zone (LLCFZ) and related to other second-and third-order
structures. Economic deposits are restricted to the influence
zone of the LLCFZ in the ultramafic rocks of the Piché Structural
Complex and peripheral to the ultramafic rocks in the
Timiskaming sediments. Four deposits/project areas have been
defined:
o Augmitto
o Cinderella
o Gamble
o Astoria.
These deposits share similar geological characteristics.
Gold mineralisation is hosted within a large hydrothermal
alteration system developed along the Lake Larder Cadillac
Fault Zone. Mineralisation is mainly found within carbonatized
ultramafic rocks forming irregular lenses of vein stockworks at
structurally favourable locations within the system. Gold-
bearing veins are associated with carbonates, fuchsite, silica,
tourmaline and occasionally albite alteration, as well as free
gold and minor arsenopyrite minerals. Depending on the
structural components of the area, one to several carbonatised
horizons support a mineralised zone. These zones strike east-
west or northeast and dip north or northwest. They are flanked
by rheologically weaker and less permeable talc-chlorite-
altered ultramafic rocks.
Mineralisation within the Rouyn system commonly occurs
within structurally controlled zones with potential for down-
plunge continuity of higher-grade shoots.
Drillhole
Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drillholes:
easting and northing of the drillhole collar
elevation or RL (elevation above sea level in
metres) of the drillhole collar
dip and azimuth of the hole
down hole length and interception depth
hole length
Drillhole/sample location and other relevant details are
described in the body of the text, in Appendices and related
Figures in this announcement.
All exploration information has been reported.
Data aggregation
methods
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths
of high-grade results and longer lengths of low grade
results, the procedure used for such aggregation
should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
A minimum intercept length of 0.3m applies to the drilling data
in the tabulated results presented in the main body of this
announcement.
Significant results with ≥0.2 g/t gold are reported.
Top-cut grades have not been applied.
Metal equivalent values have not been applied.
11 | P a g e
Criteria JORC Code explanation Commentary
Relationship
between
mineralisation
widths and
intercept lengths
If the geometry of the mineralisation with respect to
the drillhole angle is known, its nature should be
reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect.
Drill holes have been orientated to intersect the interpreted
mineralisation.
Down hole lengths are reported.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drillhole
collar locations and appropriate sectional views.
Relevant maps and plans have been included within the body
of this announcement and deemed appropriate by the
competent person.
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
The report is considered balanced and provided in context with
all information reported.
Other substantive
exploration data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
No other exploration data is considered meaningful and
material to this announcement.
Further work The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
Future exploration activities will include step-out and down-dip
drilling designed to test extensions of the known mineralised
zones and support potential future Mineral Resource
expansion.
- ENDS -